Tianshui Container House Installation
The installation of container houses in Tianshui requires focusing on three core aspects: design, construction, and after-sales service, and formulating a scientific plan based on product characteristics and site conditions.

1. Planning and Design Before Installation
The installation of container houses requires site surveys and design planning in advance. Foundation treatment is crucial. It is necessary to ensure that the ground is level and solid. For long-term outdoor use, it is recommended to pour concrete piers or strip foundations, which can enhance stability and prevent structural corrosion caused by water accumulation. The drainage system requires pre-embedded pipes, and the drainage path should be designed according to the site slope to prevent rainwater backflow. Functional layout needs to be planned in advance, determining the positions of doors and windows, electrical outlets, and internal partitions according to usage requirements. For example, construction site dormitories need to reserve ventilation windows, while commercial uses require enhanced exterior display. Some manufacturers offer customized design services, which can optimize the house orientation and lighting design based on the thermal insulation properties of polyurethane foam composite panels.
2. Technical Points During Installation
Modular assembly is a core advantage. Standard container houses adopt a cold-formed galvanized steel frame structure, with components such as top frames, corner posts, and bottom frames prefabricated in the factory and fixed on-site through screws or welding. Taking Jieweinuo quick-assembly containers as an example, their frames are formed in one go using high-frequency welding machines, with errors controlled within millimeters. Four workers can complete the installation of a single container in half a day. Seismic and wind-resistant design needs to be strengthened. Steel frame reinforcement members should be added at corners, and expansion bolts should be used at the connection points between the bottom and the foundation to withstand earthquakes of magnitude 8 and strong winds of level 11. Sealing treatment cannot be overlooked. Waterproof tape should be filled at the joints between wall panels and roof panels, and the floor should adopt fire-resistant magnesium oxide boards with slope design to ensure indoor dryness.
3. Inspection and Maintenance After Installation
Inspection should focus on structural stability, with emphasis on testing the smoothness of door and window opening and closing, the safety of electrical grounding, and the smoothness of the drainage system. Manufacturers usually provide installation training, such as explaining the rust prevention treatment cycle of galvanized steel and the replacement method of Class A fire-resistant rock wool boards. The after-sales service system is a guarantee. Reputable manufacturers promise free maintenance within the warranty period, provide 24-hour response services, and some enterprises also support house relocation and reconstruction and component recycling to reduce long-term use costs. For example, Lanzhou Liqun Company can undertake steel structure projects in six northwestern provinces, providing integrated services from production to installation.