Back to blog
Article
Tianjin Container House Installation
Admin September 15, 2026
For container house installation in Tianjin, you can contact Falilai Prefabricated Construction (Tianjin) Co., Ltd. or Changhong Integrated Housing Manufacturer. Here are the details:

Falilai Prefabricated Construction (Tianjin) Co., Ltd.
- Company Overview: Established in 1998, it is a modular temporary housing manufacturing enterprise specializing in the design, research and development, and production of packing-box units, integrated houses, and modular buildings. The company has multiple departments including production, installation, quality, safety, business, and after-sales. In 2018, the company achieved an output value of 580 million yuan and has established long-term strategic partnerships with more than ten domestic construction units such as China State Construction, China Public Transport, Beijing Construction Engineering Group, and Xinxing Construction.
- Installation Services:
- Packing-box Unit Installation: This includes installing partitions, where corner aluminum for the partition boards is first fixed on one side with rivets. First, install the entire wall panel, then install the small side panel by the door and the door head panel, followed by the channel aluminum at the door frame. Fix the corner aluminum on the other side of the wall and ceiling. Install internal corners by cutting the corresponding corner aluminum according to the internal dimensions and installing it counterclockwise. Install the ceiling line first, ensuring that the corner aluminum at the corners does not overlap. For window installation, first install the window frame aluminum, which should be fixed at a 45-degree angle on the composite board with rivets. After the window frame aluminum is installed, install the window, adjust it, and fix it to the window frame aluminum with self-drilling screws.
- Frame Erection: Simply screw the four columns onto the base plate, then place the top plate on top. Install the downspout, confirm that the ground is level, and that the diagonal dimensions are consistent. Adjust the outer edges of the columns to be perpendicular and flush with the outer edges of the top and ground frames before fixing the bottom and top screws.
- Wall Panel Installation: Before installing wall panels, carefully examine the drawings and install them according to the codes marked on the drawings. The flat mouth of the wall panel should be inside, and the镶嵌口 (inlaid opening) should face outward. When splicing, use steel strips to clamp at the虎口 (tiger's mouth, likely referring to a specific joint or notch). Do not apply too much force to avoid tearing the board. If there is a large gap at the insertion point, use rivets to refix it.
Changhong Integrated Housing Manufacturer
- Company Overview: Specializing in the color steel industry for over a decade, it provides color steel plate solutions for Tianjin, Beijing, Shandong, Hebei, and other regions year-round. It has a professional production team and a professional installation and construction team, selecting high-quality materials to ensure excellent product quality.
- Installation Services: It offers one-stop services from design, production to installation, with full tracking and coordination to ensure the smooth progress of projects.




