The installation of mobile toilets in Shunping must follow four core steps: site assessment, positioning and fixing of the main structure, connection and inspection of internal functional systems, and overall verification and adaptive fine-tuning. The specific process is as follows:

1. Site Assessment
Before installation, a comprehensive measurement of the designated area is required:

  • Levelness: The error must be controlled within a minimal range to avoid structural tilting or poor drainage due to uneven ground.
  • Soil Bearing Capacity: Determine the soil bearing capacity through geological surveys. If the data falls below design requirements, a concrete foundation must be poured to distribute the load and prevent structural subsidence.
  • Underground Pipeline Distribution: Use detection equipment to identify pipeline locations to avoid damaging water supply, drainage, or power lines during installation.
  • Surrounding Space Dimensions: Reserve sufficient passage space to ensure the mobile toilet maintains a safe distance from surrounding buildings and roads while meeting accessibility requirements.

2. Positioning and Fixing of the Main Structure
Select the fixing method based on the design type:

  • Eco-friendly Mobile Toilets (no need to connect to underground sewage pipes): Place the container steadily on a prefabricated foundation or adjustable legs, achieving rigid connection through bolts or welding to enhance wind resistance.
  • Types Connected to Municipal Sewers or Septic Tanks: Lay sewage pipes before positioning the container. The pipe slope must meet fluid discharge requirements (usually not less than 1%), and sealing materials must be used to prevent leakage. Pressure tests must be conducted at pipe connections to ensure no leaks.

3. Connection and Inspection of Internal Functional Systems

  • Water Supply Pipes: Install anti-freeze devices (such as insulation sleeves) and pressure relief valves to prevent winter freezing or damage from excessive water pressure.
  • Electrical Wiring: Use waterproof cables and ensure reliable grounding. All electrical components must meet the IP67 protection rating to prevent electric shock risks.
  • Ventilation Ducts: Ensure the exhaust system is connected to the outdoors, with air volume meeting the standard of 6-8 air changes per hour to avoid odor accumulation.
  • Wastewater Treatment Units (if equipped): Debug biochemical or physical filtration devices separately to verify their treatment efficiency meets standards, ensuring the recycling system operates independently.

4. Overall Verification and Adaptive Fine-Tuning

  • Functional Testing: Test all moving parts, including door locks, flushing devices, lighting fixtures, and exhaust fans, to ensure smooth operation.
  • Structural Stability: Recheck the installation strength of internal handrails and shelves, especially for scenarios involving elderly or disabled users, ensuring compliance with accessibility design specifications.
  • Verification of Ancillary Facilities: Check the slope of external ramps (usually not exceeding 1:12) and the clarity of warning signs to ensure compliance with safety standards.

Maintenance and Contact Information: For septic tank cleaning or pumping services, contact Haoshitong Pipeline Engineering (Beijing) Co., Ltd. (Beijing area phone: 13651152056; other areas in Hebei Province phone: 13611098718).