Shuangyang District Mobile Toilet Construction
For the construction of mobile toilets in Shuangyang District, relevant project cases can be referenced to gain experience and information in terms of environmental protection during the construction period and project procurement.

In terms of environmental protection measures during the construction period, reference can be made to the construction project of Shuangyang Licheng Gas Station by Changchun Licheng Runze Economic and Trade Co., Ltd. During the construction of this project, mobile toilets were set up to collect domestic sewage centrally, which was then regularly transported by tank trucks to the Shuangyang Sewage Treatment Plant for treatment, effectively avoiding environmental pollution caused by the indiscriminate discharge of domestic sewage. For construction wastewater, temporary anti-seepage sedimentation tanks were used for sedimentation treatment, and the treated water was reused in the construction process, achieving the recycling of water resources and reducing water waste and the environmental impact of wastewater discharge. For dust control, hard enclosures were set up at the construction site, regular water spraying was carried out for dust reduction, and transport vehicles adopted enclosed transport methods. These measures effectively reduced the impact of construction dust on the surrounding air quality. In terms of noise control, low-noise construction equipment was preferred, construction schedules were reasonably arranged, vibration reduction measures were taken for noisy equipment, and barriers were set up around the construction site, reducing the interference of construction noise with surrounding residents. For solid waste disposal, the stripped topsoil and construction waste generated during the construction period were transported to municipal designated locations. Some of the excavated earth from the tank area was used for backfilling the tank area, and some was used for compaction and leveling of non-green areas within the station. Waste packaging materials were collected and sold to waste recycling companies, and domestic garbage was collected separately and handed over to the sanitation department for unified disposal, achieving reasonable disposal and resource utilization of solid waste.
In terms of project procurement and implementation, the relocation, reconstruction, and yard maintenance project of public toilets and transfer stations was procured by the Environmental Sanitation Management Office of Shuangyang District, Changchun City. The winning bidder was Jilin Qiuguo Construction Engineering Co., Ltd., with a contract amount of 1,573,761.0 yuan. The contract was signed on February 5, 2026, and the contract performance period was from the date of contract signing to October 30, 2026 (subject to the actual start and completion dates). This project involves the relocation and reconstruction of public toilets and transfer stations and yard maintenance, providing a reference for the project management and implementation process of mobile toilet construction in Shuangyang District.




