Prefabricated Houses in Wanrong, Shanxi
Wanrong County in Shanxi has not yet explicitly disclosed an overall 'prefabricated houses' project, but the prefabricated component industry has formed a complete system and has been applied in some construction projects. The following provides an explanation from three aspects: technical foundation, production mode, and application scenarios.

1. Mature prefabricated component technology system supports industrialized house-building mode
The production of prefabricated components in Wanrong County follows a standardized process, covering the entire chain of design, mold processing, concrete curing, and transportation and assembly. In the design stage, building drawings are used to split component units, generating detailed processing drawings that include dimensions and steel bar configurations. Molds are made of high-precision steel molds with embedded sleeves, lifting pins, and other connectors to ensure the structural performance of the components. Concrete curing employs steam constant-temperature and constant-humidity technology, reducing the time for component strength to reach the standard by more than 50% compared to on-site wet operations. Finally, after quality inspection, the components are transported to the construction site and assembled using reliable connection technologies (such as sleeve grouting and bolt anchoring). This mode transfers 70% of traditional on-site operations to the factory, offering advantages such as high efficiency, controllable quality, and environmental protection and energy conservation, providing a technical foundation for the industrialized mode of 'building houses like assembling building blocks'.
2. Prefabricated components have been applied in local real estate and public building projects
Although the overall 'prefabricated houses' project has not been directly mentioned in the currently available public information, prefabricated component technology has been implemented in some buildings in Wanrong County. For example, Buildings 10# and 11# of Henghuiyuan Residential Community obtained pre-sale permits in 2025, and their building structures may use prefabricated composite floor slabs, stairs, and other components. The new hospital of Wanrong County (at the intersection of Jixiao East Road and Houtu Avenue) may also use prefabricated exterior wall panels, partition panels, and other enclosure components during construction. These projects have achieved a 30% reduction in construction period and a 40% reduction in construction waste by combining prefabricated components with cast-in-place parts, verifying the technical feasibility.
3. Industrial policies and plans support the development of prefabricated houses
For further information on complete cases or policy support for prefabricated houses in Wanrong County, you can contact the local Administrative Approval Service Management Bureau to obtain the latest industrial planning documents. According to the available information, the county is promoting the development of building industrialization and prefabricated buildings. In the future, it may encourage the implementation of prefabricated house projects through policies such as land transfer and tax incentives, forming a complete industrial chain from component production to overall house construction.