Shangrao Construction Mobile Toilet Quotation

Admin October 06, 2026

The quotation for construction mobile toilets in Shangrao varies depending on the type and rental duration, with prices ranging from 30 to 300 yuan per unit per day. The specific choice should be made based on actual needs.

I. Quotation by Toilet Type

  1. Basic Model (Toilet Only): The quotation ranges from 30 to 60 yuan per unit per day. This type of toilet has simple functions, meeting only basic toilet needs, and is suitable for short-term construction scenarios with low hygiene requirements, such as small construction sites or temporary work points.
  2. Standard Model (With Flushing + Sink): The quotation is 80 to 120 yuan per unit per day. Compared to the basic model, it adds a flushing system and a sink, significantly improving hygiene conditions. It is suitable for medium- to short-term construction projects, such as road maintenance or building floor construction.
  3. Eco-Friendly Model (Foam Sealing, No Sewer Required): The quotation is 100 to 150 yuan per unit per day. It uses foam sealing technology, eliminating the need for sewer connections, saving water, and being eco-friendly. It is suitable for scenarios with insufficient water sources or strict environmental requirements, such as field construction or ecologically sensitive areas.
  4. Luxury Model (Air Conditioning + Private Compartments): The quotation is 150 to 300 yuan per unit per day. Equipped with air conditioning and private compartments, it provides a comfortable user experience and is suitable for long-term, high-intensity construction projects or projects with high employee welfare requirements, such as large construction sites or municipal projects.

II. Discounts by Rental Duration

  1. Short-Term Rental (1-3 Days): No discount, calculated at the original price. Suitable for urgent needs or temporary events, such as exhibitions or short-term construction.
  2. Medium-Term Rental (1 Week to 1 Month): Enjoy a 10% discount. Suitable for projects with longer cycles, such as road renovations or building main structure construction, reducing overall costs.
  3. Long-Term Rental (More than 1 Month): Enjoy an average discount of 20-30%. Suitable for projects lasting several months or even longer, such as bridge construction or large-scale infrastructure projects, significantly saving costs through long-term rental.

III. Other Influencing Factors

In addition to type and rental duration, the quotation may also be affected by transportation distance, installation difficulty, and additional services (such as regular cleaning and maintenance). For example, higher transportation costs in remote areas may lead to an increase in the quotation; if professional team installation or maintenance is required, fees will also increase accordingly. It is recommended to conduct a comprehensive evaluation based on actual needs and choose the most cost-effective plan.