Rural Prefabricated House Renovation Process
The renovation process for rural prefabricated houses can generally be divided into the following steps:

1. Preliminary Preparation
It is necessary to clarify the renovation budget and schedule, and understand local policy requirements for renovation materials and construction specifications. Communicate needs with designers or renovation companies, determine the style (such as modern, pastoral, etc.), and develop a detailed design plan. Meanwhile, purchase materials (such as cement, tiles, wires, etc.) and tools (such as electric drills, spirit levels, etc.) according to the plan list to ensure full preparation before construction.
2. Basic Engineering
- Main Structure Modification: Adjust the spatial layout according to the design, remove redundant walls or doors and windows, complete operations such as wall removal, wall construction, and wall skin removal, and promptly clean up construction waste.
- Floor Treatment: Level and clean the floor to ensure a flatness error of ≤3mm, laying the foundation for subsequent floor or tile laying.
- Wall Treatment: Remove old wall skins, repair cracks, and level the walls with cement mortar to ensure verticality and flatness meet standards.
3. Plumbing and Electrical Renovation
- Circuit Relocation: Replan the plumbing and electrical circuits according to functional requirements, such as adding sockets and adjusting lighting positions. After water circuit renovation, immediately perform waterproofing in the bathroom (height ≥1.8 meters); generally, no waterproofing is required in the kitchen.
- Cabinet Measurement: Complete the first measurement of cabinets during the plumbing and electrical renovation stage to determine the positions of sockets, sinks, etc., and avoid rework later.
4. Pipe Wrapping and Tiling
- Pipe Wrapping: Pipes in the kitchen and bathroom need to be wrapped with light steel keels or red bricks; avoid using wooden keels to prevent moisture deformation.
- Tiling Preparation: Purchase odor-proof floor drains, complete waterproof layer roughening treatment, and then lay tiles. Tiles need to be soaked in water and air-dried in advance; broken tiles should be reserved for cutting, and a loss allowance of 5%-10% should be reserved.
5. Construction Stage
Carry out construction in the order of 'Carpentry → Masonry → Painting':
- Carpentry completes ceiling and gypsum line work;
- Masonry lays wall and floor tiles;
- Painting involves wall skimming and latex paint application, ensuring the base layer is dry (moisture content ≤10%) and free of particles.
6. Installation and Final Touches
- Door and Window Installation: Choose weather-resistant materials such as broken bridge aluminum or plastic steel to ensure sealing and safety.
- Furniture and Appliances: Select furniture according to the layout, install appliances such as air conditioners and water heaters, and then debug them to check if they operate normally.
- Final Touches: Clean the house, repair wall scratches, install accessories such as curtain rods, and check details with the construction team.
7. Acceptance Stage
Check if the plumbing and electrical circuits are unobstructed, the tile hollowness rate (≤5%), and the wall flatness error (≤2mm), etc. If problems are found, request rectification within a specified time to ensure compliance with design requirements and safety standards.