The installation of residential container houses requires consideration of the product type, installation environment, and professional operation. The core steps include foundation preparation, main body hoisting, component fixation, and functional debugging, with variations in installation efficiency and complexity among different companies' products.

I. Pre-installation Preparation

  1. Site Requirements
    Choose a flat and hardened ground (such as a concrete foundation) to avoid settlement caused by soft soil. Some products (such as the packing boxes from Shandong Guoheng) do not require foundation construction and can be directly hoisted as a whole, but it is necessary to ensure that the ground bearing capacity meets the requirements.
  2. Tools and Personnel
    Equip with tools such as cranes, steel wire ropes, hexagon socket bolts, and electric drills, and have 2-4 professional installers operate. Non-professionals should stay away from the installation area to prevent the risk of falling objects from height or frame collapse.
  3. Product Verification
    Check whether the main frame, walls, doors, and windows of the container are complete, and confirm whether the wind and earthquake resistance ratings (such as the Suzhou Zhongnan packing box with wind resistance of level 12 and earthquake resistance of level 8) and fireproof materials (such as flame-retardant walls) meet the requirements of the usage scenario.

II. Main Body Installation Process

  1. Hoisting and Unfolding
    • Foldable Containers: Use a crane to hoist the folded main body to the predetermined position, unfold it smoothly, and then install the support rods (such as the Tengfei third-generation product, which only takes 3 minutes to unfold).
    • Modular Containers: First, connect the bottom frame and the box corners, adjust the diagonal error to be ≤3mm, and then tighten the bolts. Next, install the secondary beams, floor base plates, and floors (such as the Boyuan container house, which requires laying magnesium oxide boards and nailing them).
  2. Wall and Door/Window Installation
    Push open the walls with doors and windows and fix them with tightening screws (such as the foldable containers, which require tightening the screws on both sides of the walls) to ensure tightness. Some products (such as the Zhuhai Zhongshen container) support 15-minute installation and half-hour occupancy, requiring quick completion of door and window debugging.
  3. Functional System Connection
    Pre-install the electrical system (such as the Shandong Guoheng product, which supports plug-and-play for air conditioners and lighting), connect the water supply and drainage pipes (such as for toilets and kitchens, which require advance planning of the pipeline layout), and test the ventilation and thermal insulation performance (such as double-glazed windows paired with fireproof and thermal insulation materials).

III. Post-installation Debugging and Acceptance

  1. Structural Stability Testing
    Check the frame deformation rate (compliant products should be below 0.3%, such as the Suzhou Zhongnan packing box at only 0.18%) and simulate extreme working conditions (such as verifying wind resistance of level 12 in coastal areas) to ensure no shaking or abnormal noise.
  2. Safety Performance Verification
    Confirm that the fireproof materials have passed the fire protection acceptance (such as the wall flame-retardant rating), the electrical system has proper grounding protection, and check whether the escape routes are unobstructed (such as multi-story containers requiring the configuration of stairs or fire escapes).
  3. Functional Layout Optimization
    Adjust the internal space according to usage needs (such as partitioning for dormitories, offices, and toilets). Some products (such as the Suzhou Zhongnan quick-assembly container) support modular combination as needed, and it is necessary to verify the firmness of the modular connections.