Qingdao Prefabricated Houses
Qingdao's prefabricated houses have clear plans and implementation paths in terms of policies, market supply, and renovation models.

At the policy support level, Qingdao has issued local supporting documents to include prefabricated panel houses in the pilot scope of original-site reconstruction. Houses included in the pilot must meet specific conditions: they must be located on state-owned land in urban built-up areas, legally constructed, and have obtained real estate property certificates. Additionally, they must fall into one of three categories of housing: prefabricated panel houses with seismic performance that does not meet current requirements, non-complete housing with poor structural integrity and inadequate functionality, and old housing identified as Class C or D with little value for repair and reinforcement. This policy provides a clear basis for the renovation of prefabricated houses and promotes the upgrading of old housing.
In terms of market supply, multiple companies in Qingdao offer products and services related to prefabricated houses. For example, Zhuoli Construction Engineering provides cement prefabricated houses with low construction costs, suitable for civilian housing, with price ranges from 360 yuan per unit to 9,000 yuan per unit, meeting market choices for different budgets and needs. Qingdao Jinmaoyuan Steel Structure Engineering Co., Ltd. offers more high-end prefabricated housing solutions. Its products integrate modern steel structure technology, modular design, and precision factory manufacturing, featuring advantages such as rapid construction, durability, flexible layout, environmental friendliness, and cost-effectiveness. They are widely used in workers' camps, emergency shelters, modular offices, residential units, and other fields, demonstrating the application potential of prefabricated houses in diverse scenarios.
Regarding renovation models, Qingdao adopts the original-site reconstruction model. The house owner can directly act as the construction unit or establish an independent renewal committee through negotiation or entrust a legal person as the construction unit. The renovation plan must undergo joint review and public announcement. After no objections are raised, relevant procedures are completed for construction implementation. Upon passing the acceptance inspection, an application can be made for real estate registration. Additionally, original-site reconstruction projects support appropriate increases in building area and improvements in living functions. The renovation costs are borne by the house owners in proportion to the building area. At the same time, financial institutions are encouraged to provide credit support, and depositors are supported in withdrawing housing provident funds or applying for loans for original-site reconstruction, providing financial security and policy support for the renovation.




