Prefabricated Panel Structure House Animation
The animation related to prefabricated panel structure houses, titled 'Prefabricated Structure PC Hoisting Training Construction Process Animation,' is recommended. This animation comprehensively and directly relates to the construction process of prefabricated panel structure houses.

The animation primarily focuses on the hoisting and construction of prefabricated components within prefabricated structures, demonstrating the entire process of hoisting key prefabricated components such as prefabricated composite floor slabs, prefabricated secondary beams, and prefabricated stairs. These components play a crucial role in the construction of prefabricated panel structure houses, and the animation allows viewers to visually observe each step from prefabrication completion to installation in place.
The animation also details the setup process of the support system. The support system is essential for ensuring the stability of prefabricated components during hoisting and installation. The animation clearly illustrates how to reasonably arrange support points and construct a stable support structure based on the weight and dimensions of the components.
The template installation process is also featured in the animation. The quality of template installation directly affects the installation accuracy of prefabricated components and the subsequent concrete pouring quality. The animation demonstrates the selection, installation position, and fixation methods of templates, enabling viewers to understand how to ensure tight adhesion between templates and prefabricated components, avoiding issues such as concrete leakage.
Double-sided tape positioning is an important detail in the animation. During the hoisting of prefabricated composite floor slabs, when the component is hoisted to 1 meter above the installation position, three workers are required to align it accurately. After slow lowering, the axis and elevation are precisely adjusted according to the double-sided tape. The use of double-sided tape not only improves positioning accuracy but also serves as a seal to some extent, preventing concrete leakage during pouring.
Professional hoisting equipment operation and component positioning adjustments are also key contents of the animation. Different types of prefabricated components require different hoisting equipment for lifting. The animation showcases the structure and usage methods of various hoisting equipment, as well as how to perform reasonable hoisting operations based on the characteristics of the components. After the components are positioned, precise adjustments are necessary to ensure that indicators such as the axis, elevation, and perpendicularity of the components meet design requirements.