Back to blog
Article

Application for Renovation of Prefabricated Panel Houses

Admin September 18, 2026

The application for renovation of prefabricated panel houses should be carried out in accordance with specific circumstances and local policies, with key steps including understanding policies, preparing materials, submitting applications, commencing construction after approval, and completing acceptance inspections.

I. Policy Basis and Scope According to the State Council's '15th Five-Year Plan for Urban Renewal,' approximately 500,000 units of dilapidated urban housing will be addressed over the next five years. Eligible dilapidated prefabricated panel houses can be renovated through the 'original demolition and reconstruction' channel. The scope of renovation typically includes two types of houses: first, prefabricated panel houses identified by professional institutions as Class C (partially dilapidated) or Class D (entirely dilapidated), with priority given to Class D houses; second, large-panel residential buildings (including prefabricated panel houses) completed before 2000. It should be noted that not all prefabricated panel houses are eligible, and eligibility should be based on appraisal results and policy scope.

II. Application Requirements

  1. Property Attributes: The house must be located on state-owned land and have a real estate ownership certificate.
  2. Safety Rating: The house must be appraised as Class C or Class D dilapidated, with priority given to Class D houses for approval.
  3. Owner Consensus: The renovation must comply with local urban planning requirements, and all owners must reach a consensus on the renovation plan.
  4. Cost Sharing: Original demolition and reconstruction are not fully funded by the government; construction costs are primarily shared by the owners.

III. Application Process

  1. Policy Consultation: Inquire with local housing and urban-rural development departments or planning departments about specific policies regarding old house demolition, land use, and building permits.
  2. Material Preparation: Include identification documents, house property certificates, design drawings and plans, application forms, and, if involving shared property, consent forms or power of attorney from all co-owners.
  3. Application Submission: Submit materials to the village (residential) committee or local planning and construction department, fill out an application form, and pay fees (if applicable). Relevant departments will conduct a preliminary review and arrange on-site inspections.
  4. Approval and Construction: Obtain a demolition and reconstruction permit after approval and commence construction according to the approved plan.
  5. Acceptance Inspection and Registration: Apply for acceptance inspection after construction completion, submit inspection materials, and obtain new real estate and land certificates upon passing the inspection.

IV. Precautions

  1. Beware of Fraud: Application and approval processes must be carried out through official channels; do not trust non-official sources.
  2. Eligibility Restrictions: Strictly comply with policy scope, such as house age, safety rating, and land nature.
  3. Planning Compliance: The renovation plan must comply with local planning requirements to avoid approval failure due to violations.