Demolition of Prefabricated Panel Houses

Admin September 18, 2026

The demolition of prefabricated panel houses is not carried out comprehensively but is classified and handled based on the safety condition of the houses, their disaster-resistance capabilities, and urban planning needs. The following three types of houses will be prioritized for demolition.

Type 1: Houses identified as meeting the dangerous building standard (especially Grade D) If a prefabricated panel house has problems such as foundation subsidence and obvious damage to the main structure, and fundamental safety hazards cannot be resolved through repair and renovation, it is usually identified as a dangerous building (e.g., a Grade D dangerous building). Due to material aging, construction process defects, or long-term lack of maintenance, these houses no longer meet safe living conditions. Demolition is the bottom-line measure to safeguard the lives and property of residents. For example, some early-built prefabricated panel houses have been included in dangerous building renovation or demolition plans due to a decrease in structural bearing capacity caused by concrete carbonation and steel bar corrosion.

Type 2: Houses with substandard disaster-resistance capabilities Prefabricated panel houses are prone to collapse or severe damage in disasters such as earthquakes and floods due to their poor structural integrity and weak seismic performance. If a house fails to meet the current seismic fortification standards (such as seismic fortification intensity requirements) or flood control standards, it may be included in the scope of demolition or reconstruction. For example, old prefabricated panel houses located in earthquake zones or flood-prone areas will be prioritized for demolition to reduce disaster risks if they are assessed as unable to have their disaster-resistance capabilities enhanced through reinforcement.

Type 3: Houses conflicting with urban infrastructure construction When urban planning requires the construction of municipal projects such as subways, viaducts, and road widening, if prefabricated panel houses are located within the planned red line, demolition should be carried out according to the plan. Such demolitions are oriented towards public interests and are usually accompanied by clear compensation and resettlement plans to ensure that the rights and interests of residents are not compromised.

Resettlement plans include monetary compensation, physical resettlement, and comprehensive renovation:

  • Monetary compensation: Directly issue demolition compensation payments, and residents can purchase commercial housing or choose other living arrangements on their own.
  • Physical resettlement: Provide newly built housing to ensure that residents are resettled on-site or nearby, reducing changes in living costs.
  • Comprehensive renovation: For houses with a sound main structure but old problems, improve living conditions by reinforcing the structure, updating the exterior facade, installing elevators, etc., avoiding large-scale demolition and construction.

The policy background emphasizes 'classified handling and prioritizing dangerous and vulnerable cases'. Both the 'Guidelines for Revitalizing and Optimizing Urban Stock Space' issued by the Ministry of Natural Resources in 2025 and the 'Opinions on Continuously Promoting the Urban Renewal Action' issued by the General Office of the CPC Central Committee and the General Office of the State Council clearly state that, except for the above three types of cases, the vast majority of prefabricated panel houses will be improved in terms of comfort through old renovations rather than comprehensive demolition to achieve efficient utilization of resources and sustainable urban development.