Prefabricated Housing Structure Calculation
The calculation of prefabricated housing structures mainly involves the calculation of the prefabrication ratio and the assembly ratio, as well as the special structural calculation points for modular concrete buildings.

Prefabrication Ratio Calculation
The prefabrication ratio refers to the volume ratio of the concrete used in prefabricated components to the total concrete used in the main structure and enclosure structure above the outdoor ground level of the building, applicable to reinforced concrete prefabricated buildings. The calculation formula is: Prefabrication Ratio = Volume of Prefabricated Concrete / Total Volume of Concrete × 100%. Here, the volume of prefabricated concrete includes the total volume of prefabricated components (such as shear walls, columns, beams, floor slabs, etc.) in the main structure and external enclosure structure; the total volume of concrete is the sum of the volumes of the prefabricated and cast-in-place parts (such as cast-in-place beams, slabs, nodes, etc.). Standards vary by region. For example, in Beijing, the types of prefabricated components included in the calculation include shear walls, columns, stairs, balcony slabs, etc., while the cast-in-place part only accounts for the volume of cast-in-place concrete above the ±0.000 elevation.
Assembly Ratio Calculation
The assembly ratio refers to the ratio of the quantity (or area) of prefabricated components or building products to the total quantity (or area) of similar components, used to evaluate the degree of industrialization. The calculation method varies by component type and can use area ratio, quantity ratio, or length ratio. Taking Shanghai as an example, the assembly ratio of a single building = prefabrication ratio + product assembly ratio + other incentive items. Here, the product assembly ratio is calculated based on the quantity or area ratio of a single product (such as doors and windows, integrated bathrooms); incentive items include points for the application of technologies such as structural-insulation integration and full decoration. Beijing adopts a scoring system, where the assembly ratio = actual score value of each indicator / (100 - total score value of missing evaluation content), and the scoring table covers indicators such as the main structure, enclosure walls, decoration, and equipment pipelines.
Key Points for Structural Calculation of Modular Concrete Buildings
Modular buildings are assembled on-site from prefabricated concrete module units and require calculation in two stages:
- Construction Stage Checking Calculation: When a single module is fabricated, transported, and hoisted, its bearing capacity and deformation must be checked, taking into account the influence of temporary supports to ensure that the force transfer performance at the joints meets requirements.
- Service Stage Checking Calculation: The overall building must undergo bearing capacity, stability, and deformation checking calculations according to its actual stress state, with a focus on the structural design of the joints between modules (such as bolt connections, welding, etc.).
Design of Prefabricated Components: Floor slabs often use composite slabs or fully prefabricated slabs, and wall panels are mostly sandwich insulation prefabricated wall panels. They must meet conventional bearing capacity requirements, with particular attention to the force transfer performance and structural requirements at the joints. Boundary conditions consistent with the actual situation should be used in the calculations.