There are old prefabricated-panel houses in Beihai, Guangxi, and currently, no detailed policies or case information regarding their demolition, reconstruction, or renovation have been found. Here is a detailed introduction to the old prefabricated-panel houses in Beihai, Guangxi:

I. Typical Areas and Housing Conditions
In Beihai, Guangxi, the old prefabricated-panel houses are exemplified by the dormitory area of the Beihai Fan Factory. Located at No. 30 Sichuan Road, this dormitory area was built in the 1980s and retains three four-story prefabricated-panel buildings. These houses use prefabricated panels as floor materials, which was a common construction method at the time. However, as time has passed, these houses have gradually revealed common problems found in old residential areas.
II. Common Problems in Old Residential Areas
- Poor Road Conditions: The roads within the dormitory area are mostly covered with gravel or yellow mud, and most of the cement roads are damaged, causing inconvenience for residents' travel.
- Lack of Parking Facilities: Due to the absence of planned parking lots, electric bikes and cars can only be parked in the open spaces between buildings or outside stairwells, leading to crowded spaces and potential safety hazards.
- Insufficient Charging Facilities: Electric bikes need to be charged using 'flying wires,' which means pulling wires from residents' homes to charge the bikes. This not only poses safety risks but also affects the overall aesthetics of the residential area.
- Inadequate Lighting Facilities: There are no streetlights in the dormitory area, and only old-fashioned pull-cord lights installed by residents on the walls provide lighting. The lighting conditions are poor, causing inconvenience for residents traveling at night.
III. Policies and Renovation Situations
Currently, no detailed policies or case information regarding the demolition, reconstruction, or renovation of prefabricated houses in Beihai, Guangxi, have been found. This means that for the renovation or demolition and reconstruction of these old prefabricated-panel houses, it may be necessary to wait for the introduction of relevant policies or further research and planning.