Prefabricated House Partition Wall Installation Video

Admin September 18, 2026

You can refer to the following videos related to the installation of partition walls in prefabricated houses for installation guidance:

  1. "Installation of Prefabricated Wall Panels in Prefabricated Buildings"
    This video focuses on the installation process of prefabricated wall panels in prefabricated buildings, covering the entire process from basic preparation to wall panel positioning, fixation, and connection node treatment. Key contents include:
  • Before installation, check the dimensions of the wall panels, the positions of reserved holes, and embedded parts to ensure they match the design drawings;
  • Use specialized lifting tools for vertical lifting to avoid deformation or damage to the wall panels;
  • Adjust the verticality and flatness of the wall panels using a level and laser positioning instrument, with errors controlled within the allowable range of the specifications;
  • Fix the wall panels using mechanical connections (such as bolt fastening) or wet connections (such as grouting sleeves) to ensure structural stability.
  1. "Animation of Prefabricated Wall Installation Process (Guangzhou Fourth Construction)"
    This animation visually demonstrates the installation process of prefabricated walls in three dimensions, suitable for understanding construction logic and operational details. Key steps are as follows:
  • Base treatment: Clean the dust and oil stains on the installation surface and mark the positioning lines for the wall panels;
  • Wall panel positioning: Move the wall panels precisely to the installation position through a guide rail or pulley system;
  • Temporary fixation: Use diagonal braces or adjustable supports to fix the wall panels and prevent overturning;
  • Permanent connection: Complete structural connections according to design requirements using welding, bolt connections, or cast-in-place concrete nodes;
  • Gap treatment: Fill with elastic sealant or fireproof materials to ensure airtightness and fire resistance.
  1. "Sixth-Generation Lifting Video for Prefabricated Buildings---Installation of Prefabricated Wall Panels"
    This video focuses on demonstrating the lifting process of sixth-generation prefabricated technology, emphasizing efficiency and safety. Technical highlights include:
  • Modular lifting design: Achieve rapid lifting and positioning of wall panels through standardized lifting tools;
  • Collaborative work process: Close cooperation among crane operators, signalers, and installers to shorten the installation time for a single wall panel;
  • Real-time monitoring system: Use sensors to monitor the stress and deformation of wall panels to ensure construction safety;
  • Environmental protection measures: Reduce on-site wet work to lower dust and noise pollution.
  1. "Animation Video: Demonstration of the Entire Construction Process of Prefabricated Structural Residences"
    This video systematically reviews the entire construction process of prefabricated residences, with the installation of prefabricated wall panels covering the following aspects:
  • Construction preparation: Review the axis, elevation, and positions of embedded parts, and prepare installation tools and materials;
  • Wall panel transportation and stacking: Use specialized transportation racks to prevent wall panel breakage, with the number of stacking layers not exceeding the specified limit;
  • Installation sequence: Follow the principle of "outside first, then inside; main first, then secondary," prioritizing the installation of exterior wall panels to form a closed space;
  • Quality acceptance: Check the verticality, flatness, and connection node strength of the wall panels, and fill in the concealed work acceptance records.

It is recommended to select videos for reference based on actual engineering conditions, focusing on installation processes, quality standards, and safety specifications to ensure construction meets design requirements.