Prefabricated House Installation Process Video
Currently, a direct video link for the installation process of prefabricated houses is not available, but the installation process can be summarized based on relevant textual descriptions.

Prefabricated houses, also known as prefabricated buildings, typically follow a set of steps in their installation process to ensure structural safety and stability. Here is a general overview of the installation process:
I. Foundation Construction
Before installing a prefabricated house, foundation construction is required first. This includes steps such as land leveling, foundation excavation, and concrete foundation pouring. The quality of foundation construction directly affects the stability and safety of the entire house, so it must be carried out strictly in accordance with design requirements.
II. Component Transportation and Inspection
The components of a prefabricated house are usually prefabricated in a factory and then transported to the construction site. During transportation, it is necessary to ensure the integrity and safety of the components to avoid damage. Upon arrival at the construction site, the components also need to be inspected to check whether their dimensions and quality meet design requirements.
III. Component Hoisting and Installation
After foundation construction is completed and the components pass inspection, hoisting and installation work can begin. This usually requires the use of professional hoisting equipment, such as cranes. During hoisting, it is necessary to ensure the accurate positioning and stable connection of the components. During installation, operations should be carried out in accordance with design drawings and construction specifications to ensure that the installation position and angle of each component are accurate.
IV. Node Connection and Fixation
After component installation is completed, node connection and fixation work are also required. This usually involves connecting the components together using bolts, welding, etc., to form an overall structure. The quality of node connection directly affects the seismic performance and overall stability of the house, so it must be carried out strictly in accordance with design requirements.
V. Decoration and Renovation
After the main structure is installed, decoration and renovation work can be carried out. This includes steps such as painting the interior and exterior walls, laying the floor, and installing doors and windows. Decoration and renovation work can be customized according to personal preferences and design requirements to make the house more aesthetically pleasing and comfortable.