Prefabricated House Installation Case Sharing
There are a variety of prefabricated house installation cases, covering different types and scenarios. Here are the specific shares:

VDC (vale de cambra) Project: Portuguese construction company SUMMARY utilized the 'Gomos System' to create a 10,743-square-foot mixed-use development project in the Serra da Estrela mountain range. The project includes six tubular housing units, demonstrating through efficient construction the application potential of prefabricated houses in complex terrains and scenarios with diverse functional requirements, providing valuable experience for similar projects.
Henan Qixian Prefabricated Cement House Project: On a standardized production line, the production cycle for a single module is only 7 days, with errors strictly controlled within 2 millimeters, reflecting a high level of precision in production. After being transported to the construction site, with the help of a 50-ton crane and an intelligent positioning system, the main structure of a single 200㎡ three-story villa can be installed in just 4 hours, and a 100㎡ house can be ready for occupancy in just 5 days from an empty lot, significantly shortening the construction period and improving construction efficiency.
2024 Shenzhen Anti-Epidemic Prefabricated Cement House Project: Facing urgent anti-epidemic needs, this project built 300 isolation wards in 48 hours, reducing the traditional construction period by 90%. It was praised by the World Health Organization as a 'miracle of infrastructure construction'. This case highlights the rapid response and efficient construction capabilities of prefabricated houses in responding to public health emergencies, providing strong support for safeguarding public health security.
High-End Container House Project: It uses Jinbang board fiber cement exterior wall decorative cladding, combined with studs, insulation materials, gypsum boards, etc., to form a composite wall that serves as both maintenance and decorative integrated cladding for container houses. Construction methods such as stud dry hanging, tongue-and-groove jointing, and clip fixing are used, which not only improve construction efficiency but also endow the house with inter-story displacement and seismic resistance, meeting the requirements of high-end users for house quality and safety.
Prefabricated Spliced Light Steel House Project: During the demand analysis and design phase, designers create 3D model designs based on the client's family size, living habits, and architectural style preferences, allowing clients to freely choose different module combinations. In the component production and quality inspection phase, after the design plan is finalized, the data is transmitted to the factory for production using fully automatic cold-forming equipment. Each stud is precisely numbered and marked with its installation position, and strict dimensional tolerance checks are conducted during production (usually controlled within ±2mm). During on-site prefabricated splicing and installation, after the foundation construction is completed, the construction team assembles according to the numbered drawings. Typical installation processes include laying a moisture-proof layer and installing ground sill beams, etc. The entire main structure installation usually takes only 7-15 days to complete the roof sealing, reducing the construction period by more than 60% compared to traditional brick-and-mortar structures.