Back to blog
Article

Prefabricated House in Hongdong

Admin September 18, 2026

The prefabricated house technology in Hongdong County has multiple advantages, but also certain limitations.

Advantages:

  • Long service life, high strength, and good safety: Some enterprises in Hongdong County adopt the composite steel mesh construction technology. The main body of the house can have a service life of over 70 years, and the wall strength is increased by 2 times. Its safety performance in withstanding magnitude-9 earthquakes and category-12 typhoons far exceeds that of traditional rural residential standards. Regular prefabricated concrete or steel structures achieve earthquake resistance through integral connections or high-quality materials, with a seismic fortification intensity of up to magnitude 8. The earthquake resistance of steel structures is more than 50% higher than that of brick-and-mortar structures.
  • High construction efficiency: Composite steel mesh construction gets rid of the dependence on manual skills in traditional bricklaying processes and is not affected by rainy weather. A heavy steel villa of over 200 square meters can be ready for occupancy in just 3 months from the start of construction, with the construction period shortened by nearly half. For a three-story rural residential building of 150 square meters, the main body can be completed in five days using the prefabricated method and delivered with fine decoration within two months, while traditional brick-and-mortar construction takes at least 6 - 8 months.
  • High degree of quality standardization: Prefabricated components are manufactured in factories using computer-controlled molds, with errors in each wall panel measured in millimeters, ensuring more stable quality. In contrast, the quality of traditional brick-and-mortar construction depends on the skills of the workers, and differences may exist even between different rooms in the same building.
  • Improved construction environment: Prefabricated components are pre-made into building parts in factories or on-site and then transported to the construction site for assembly. They are less affected by weather conditions, and the amount of construction waste, dust, and noise generated on-site is significantly reduced. The factory-based production model facilitates centralized management and use of materials, reducing material waste.

Limitations:

  • High initial cost: The initial cost of prefabricated houses is 10% to 30% higher than that of brick-and-mortar houses, which may increase construction costs and is a factor that needs to be considered by users with limited budgets.
  • Limited layout and decoration: The layout of the house cannot be freely changed. The water and electricity pipelines are fixedly arranged at the factory, making it extremely difficult to modify the wiring or add/remove points later. The decoration and assembly mode is fixed, and only the factory design can be used, lacking certain flexibility.