Back to blog
Article

Prefabricated House Flooring

Admin September 17, 2026

Answers to questions about prefabricated house flooring in different scenarios are as follows:

I. Reinforcement Requirements for Laying Floor Tiles in Rural 30-Year-Old Cement Prefabricated Panel Houses If floor tiles need to be laid on rural cement prefabricated panel houses that have been in use for 30 years, the original prefabricated panels must be reinforced. Due to their long construction age, such prefabricated panels generally have problems such as thin steel bars, no transverse reinforcement bars, large spans leading to high elasticity, and possible local subsidence (sagging) after long-term use. If tiles are laid directly, the increased load will accelerate the aging of the prefabricated panels, resulting in soft, bulging, or cracked floor tiles. There are two reinforcement methods:

  1. Reinforced Concrete Reinforcement: Add two small beams below the prefabricated panels, with the small beams crossing the prefabricated panels in an 'X' shape. Holes need to be drilled in the prefabricated panels, and concrete is poured through grouting to form an integral structure between the small beams and the prefabricated panels, enhancing the load-bearing capacity.
  2. Steel Beam Reinforcement: Accurately locate the positions of the steel beams on the walls on both sides, chisel out installation slots, and then fix the steel beams with supports to ensure that the surfaces of the steel beams completely fit the bottom of the prefabricated panels, dispersing the load and reducing the risk of deformation. After reinforcement, the prefabricated panels can safely have floor tiles laid on them, and their service life can be extended by more than 10 years.

II. Advantages of Prefabricated Floors in Modular Buildings Modular buildings adopt factory prefabricated production. Their floors, ceilings, water and electricity pipelines, and other components are assembled on an assembly line and then transported to the site for assembly. The core advantages include:

  • Short Construction Period: On-site operations only require assembly, without traditional wet construction, improving construction efficiency by more than 50%;
  • Controllable Quality: Factory standardized production reduces human errors, and indicators such as floor flatness and strength are more stable;
  • Energy Conservation and Environmental Protection: High material utilization rate, with building waste reduced by about 70%, and supporting dry construction, reducing dust pollution;
  • Convenient Maintenance: The integrated design of floors and pipelines allows for later maintenance without damaging the structure, reducing maintenance costs by 30%.

III. Market Selection of Prefabricated Terrazzo Floor Tiles The mainstream prefabricated terrazzo floor tiles on the market include gray terrazzo floor prefabricated panels and inorganic terrazzo prefabricated panels. When purchasing, the following parameters should be considered:

  • Specifications: Common sizes are 300×300mm and 600×600mm, with a thickness of 15-20mm. The size should be selected according to the space size;
  • Price: Affected by materials (such as quartz sand content) and processes (such as polishing degree), the unit price ranges from 50-150 yuan/㎡;
  • Applicable Places: Gray terrazzo has strong stain resistance and is suitable for public areas; inorganic terrazzo has good slip resistance and is often used in bathrooms;
  • Service Guarantee: Prioritize merchants that offer a 7-day replacement guarantee, 48-hour delivery, and material test reports to reduce after-sales risks.

IV. Production Process of Prefabricated Cement Floors The production of prefabricated cement floors must strictly follow the process flow:

  1. Mold Preparation: Clean the mold and apply a release agent to prevent adhesion;
  2. Mortar Pouring: Pour cement mortar into the mold, with the thickness controlled at 80% of the design value;
  3. Steel Bar Placement: Place steel bar meshes horizontally and vertically, with a steel bar diameter of ≥6mm and a spacing of ≤150mm to ensure structural strength;
  4. Sand and Gravel Covering: Evenly spread sand and gravel with a particle size of 3-5mm on the surface of the steel bars, with a thickness covering the steel bars by 2-3mm;
  5. Surface Treatment: Apply a layer of dry mud (a mixture of fine sand and cement) and then scrape it flat with a scraper, controlling the flatness error to ≤2mm;
  6. Curing and Solidification: Cure at room temperature for 28 days, maintaining a humidity of ≥90% during the period to avoid cracking.