Prefabricated House Eaves Construction Method
The construction method for the eaves of prefabricated houses can refer to the construction process of prefabricated concrete cantilevered eaves, which is mainly divided into five stages: design and planning, preparation, construction steps, post-processing, and safety and quality control.

Design and Planning: Determine the size, shape, and projection length of the eaves based on the overall design and functional requirements of the house, ensuring coordination with the architectural style and meeting usage requirements. Structural design should focus on structural strength and stability, ensuring safety under load by reasonably configuring reinforcement and ensuring firm connections.
Preparation: Material preparation should cover core building materials such as reinforcement, concrete, and formwork, ensuring that material quality meets design standards. Site layout involves clearing the construction area and setting up sturdy scaffolding and protective facilities to provide a safe foundation for subsequent operations.
Construction Steps:
- Construction Preparation: Familiarize yourself with the drawings and prepare a construction plan, clarifying technical requirements and quality standards, and conducting technical briefings for workers.
- Setting Out: Mark the installation position lines for prefabricated panels and the beam bottom elevation lines on the wall, ensuring that the marking accuracy is fully consistent with the design drawings.
- Hoisting: Check the wear, cracks, or deformation of hoisting equipment (hooks, ropes, lifting rings, etc.), and follow the principle of 'low first, high later; near first, far later' to reduce the number of crane movements and lower risks.
- Formwork Installation: Nail wooden wedges at the installation positions on the wall as support points, ensuring tight splicing without leakage gaps and a smooth surface when installing the formwork.
- Concrete Pouring: Before pouring, check the stability of the formwork, the position of the reinforcement, and the concrete mix ratio. During pouring, vibrate in layers to ensure compactness.
- Curing and Formwork Removal: Cure after the concrete reaches the design strength, then remove the formwork and side panels to avoid structural damage caused by premature formwork removal.
Post-Processing: Polish and clean the surface of the eaves to ensure a neat appearance; apply waterproof coatings or lay waterproof membranes on the top and sides to prevent rainwater leakage.
Safety and Quality Control: Strictly adhere to safety regulations during construction, such as wearing safety protective equipment and setting up warning signs; conduct quality inspections at each construction step, including reinforcement tying, concrete strength, and formwork perpendicularity, to ensure compliance with design requirements.