Back to blog
Article

How to Apply for Prefabricated House Certification

Admin September 18, 2026

The application process for prefabricated house certification varies depending on the intended use and regional requirements. Here are the specific procedures:

1. Prefabricated Houses on Rural Homesteads in China

  1. Homestead Application and Approval
    • Applicants must be members of the village's collective economic organization and comply with the 'one household, one homestead' principle. They need to submit materials such as their ID card, household registration book, homestead application form, and land ownership certificate.
    • The approval process includes discussions and public announcements by the villager group, review by the village-level organization, and joint review by the township government (involving departments such as agriculture and rural affairs, and natural resources). Upon approval, the 'Rural Homestead Approval Certificate' and the Rural Construction Planning Permit are issued.
  2. Construction and Acceptance
    • Before construction begins, an application must be made to delineate the homestead land area, and construction can only start after on-site marking and verification.
    • After the house is completed, an application for completion acceptance must be submitted to the township government. Upon passing the acceptance, the approved documents and acceptance opinion form are used to apply for real estate registration and obtain the ownership certificate.

2. International Export of Prefabricated Houses

  1. Certification Rules in Target Countries
    • United States: Requires certification through HUD or IRC for residential buildings, compliance with UL electrical standards; most states prohibit placing non-agricultural buildings on agricultural land.
    • European Union: Mandatory CE certification (including EN 1090 for steel structures and EN 14889 for concrete standards), with planning permission required.
    • Australia: Requires CodeMark certification and compliance with AS/NZS 1170 structural standards, with post-delivery energy efficiency assessment through the NCC.
    • Southeast Asia: Requires an RCEP certificate of origin and local construction permits, with some countries managing them as 'temporary buildings' (with a service life of ≤5 years).
  2. Compliance Self-Check Points
    • Confirm land use restrictions (e.g., prohibition of non-agricultural buildings on agricultural land in the US).
    • Match usage scenarios: choose light steel frame villas for self-occupancy (seismic resistance ≥8 degrees), container modular houses for scenic area homestays, and folding container houses for temporary offices.
    • Climate adaptation: use polyurethane insulation in tropical regions, rock wool + Class A fireproof boards in cold regions, and ensure wind resistance ≥10 degrees.
  3. Manufacturer Selection
    • Verify whether the scope of the ISO 9001 quality management system certification includes 'modular building production'.
    • Request recent bills of lading or customs clearance records for exports to the target country, and conduct video factory inspections to confirm the operation of CNC equipment.

3. Prefabricated Houses in Urban Areas of China

  1. Confirmation of Land Use Rights: Obtain state-owned land use rights through assignment or allocation and apply for the State-owned Land Use Right Certificate.
  2. Planning and Construction Permits: Submit architectural design plans and apply for a Construction Engineering Planning Permit; apply for a Construction Permit from the construction administrative department.
  3. Environmental Protection and Fire Safety Reviews: Projects that may impact the environment must submit an environmental impact assessment report for approval by the environmental protection department; architectural design and construction plans must pass review by the fire safety department.
  4. Acceptance and Property Rights Confirmation: After the house is completed, it must pass acceptance by relevant departments and then apply for the House Ownership Certificate (Real Estate Right Certificate) upon qualification.

Recommendation: Consult local real estate registration agencies or professional lawyers before application to ensure compliance with the latest policy requirements.