Back to blog
Article

Prefabricated Cast-in-Place Housing

Admin September 17, 2026

Prefabricated cast-in-place housing is a construction model that combines prefabrication and cast-in-place techniques, achieving efficient construction and structural integrity through the connection of factory-prefabricated components with on-site cast-in-place elements.

Process Principles and Core Advantages

The core of prefabricated cast-in-place housing lies in the synergy between "prefabrication" and "cast-in-place":

  1. Prefabrication Stage: Standardized production of concrete components (such as wall panels, floor slabs, beams, and columns) is completed in factories, utilizing molds and automated equipment to control dimensional accuracy and reduce on-site wet work. For example, a public housing project in Shenzhen, Guangdong, achieved over 90% of its construction processes in the factory through the prefabrication of 6,028 concrete modules, significantly shortening the on-site construction period.
  2. Cast-in-Place Stage: At the construction site, concrete is poured to connect the prefabricated components into an integral structure. The cast-in-place technique fills gaps between components, encapsulates connection nodes (such as bolts and steel sleeves), ensures structural load continuity, and avoids potential weak nodes found in traditional prefabricated buildings.

Advantages:

  • Construction Period and Environmental Protection: Factory prefabrication reduces on-site work time, lowering dust and noise pollution.
  • Quality Control: The factory environment is superior to construction sites, making it easier to ensure component dimensional accuracy and concrete strength indicators.
  • Structural Safety: Cast-in-place connections compensate for mechanical defects between prefabricated components, enhancing overall seismic and wind resistance.

Technical Implementation Points

  1. Component Design: Customize the shape, size, and connection methods (such as mortise-and-tenon joints and steel bar anchoring) of prefabricated components according to project requirements, ensuring compatibility with cast-in-place parts.
  2. On-Site Construction:
    • Positioning and Fixing: Use laser positioning and temporary support systems to ensure the installation accuracy of prefabricated components.
    • Connection Treatment: Clean the contact surfaces of components and use high-strength grout or concrete to pour connection nodes.
    • Curing and Inspection: Cast-in-place concrete must be cured according to specifications and verified for connection quality through ultrasonic testing and load tests.

Typical Application Scenarios

This model is suitable for projects with high demands on construction period and quality, such as public housing, schools, and hospitals. For example, the Shenzhen public housing project shortened the construction period of a single building from the traditional two years to one year through prefabricated modular construction, while reducing construction waste emissions by over 30%, demonstrating the efficiency and environmental value of industrialized construction.

Note: Specific technical details (such as connection node design and concrete mix proportions) must be adjusted according to project design specifications, geological conditions, and seismic requirements, and should be implemented by professional teams.