Tiling on Prefabricated Floor Slabs of Old Houses
The prefabricated floor slabs of old houses can be tiled, but they need to be handled carefully and professional steps should be followed to ensure safety and durability.

Load-bearing Inspection
The prefabricated floor slabs of old houses may have cracks or deformation risks due to their long service life. Before tiling, it is necessary to focus on inspecting the structural integrity of the floor slabs, observing for obvious cracks, subsidence, or abnormal noises. If structural damage is found, construction should be stopped immediately and professional assessment should be sought to avoid slab collapse caused by increased loads from tiling.Reinforcement Measures
If the stability of the floor slabs is insufficient, reinforcement should be carried out in advance. There are two common methods:- Reinforced Concrete Reinforcement: Add two 'X'-shaped small beams below the prefabricated slabs and enhance the overall load-bearing capacity through drilling and grouting. This method is suitable for slabs with minor cracks but requires the destruction of some original structures and has a relatively long construction period.
- Steel Beam Support Reinforcement: Erect steel beams inside the house and disperse the loads to the walls through support structures. The positions of the steel beams need to be accurately measured to ensure complete contact with the bottom of the prefabricated slabs. This method has less impact on space but is more costly and requires professional team operation.
Note: Direct tiling may accelerate the aging of the prefabricated slabs, and reinforcement is a key prerequisite.
Base Layer Treatment
Before tiling, the base layer should be thoroughly cleaned:- Remove dust, oil stains, loose particles, and other impurities to avoid affecting the bonding strength.
- Repair pits and cracks with cement mortar to ensure that the flatness error of the base layer does not exceed 2mm. If the base layer is loose, an interface agent should be applied to enhance adhesion.
Tiling Method Selection
- Wet Laying Method: Soak the tiles until no bubbles appear and then dry them in the shade. Lay them with cement mortar and water them for 48 hours after laying. This method is low-cost but prone to hollowing due to water evaporation, suitable for dry environments.
- Dry Laying Method: First, lay a layer of dry and hard cement mortar as a cushion and then lay the tiles. This method has high flatness and a low hollowing rate, especially suitable for houses with underfloor heating, but is more costly.
Joint Treatment
The joints of the prefabricated slabs should be filled with flexible sealants (such as silicone sealant), and 2-3mm expansion joints should be reserved. Flexible materials can buffer the stress generated by thermal expansion and contraction or vibration of the floor slabs, preventing tile cracking or arching.Professional Assessment
Before tiling old prefabricated slab houses, it is advisable to commission a structural engineer to conduct load calculations and safety assessments. The engineer will consider factors such as slab thickness, steel bar configuration, and house age to determine whether additional reinforcement or adjustment of the construction plan is required to ensure structural safety after tiling.