Back to blog
Article

Neijiang Container House Installation

Admin September 15, 2026

The installation of container houses in Neijiang can be completed through a one-stop service of custom design, production, and installation by professional manufacturers. The specific process needs to be carried out in combination with the type of house (such as standard containers, foldable containers, refrigerated containers, etc.) and construction requirements.

1. Select a Professional Installation Manufacturer

There are several local manufacturers in Neijiang that provide container house installation services. For example, Jinhua Xin'an Steel Structure Engineering Co., Ltd. covers the entire process of container design, production, sales, and installation, offering personalized customization plans suitable for construction sites, municipal engineering projects, and other scenarios. Additionally, contact information for container manufacturers in Neijiang can be obtained through platforms like Douyin (e.g., 132-815-55802), allowing direct consultation with manufacturers for installation services.

2. Clarify Installation Types and Processes

  1. Standard Container Houses
    The installation process includes bottom frame installation, secondary beam fixation, floor laying, and wall assembly. For example, the bottom frame is connected to the bottom beams using hexagon socket head bolts, and the diagonal error is adjusted to ≤3mm before tightening. The floor baseboard is laid along the 6-meter direction, and the joints need to be marked with chalk lines and nailed at intervals of 300-350mm.

  2. Foldable Container Houses
    Installation is more convenient and requires two people to operate:

    • Check the stability of the wire ropes, lift the main frame, and unfold it;
    • Push open the walls and fix them with tightening screws;
    • Lift and place it at the predetermined position, ensuring that non-staff members stay away from the installation area throughout the process.
  3. Refrigerated Container Installation
    Additional attention needs to be paid to refrigeration equipment and insulation requirements:

    • Installation includes container body assembly, refrigeration equipment coordination, and door seal inspection;
    • The site foundation (such as concrete floors), power supply conditions, and transportation routes need to be confirmed in advance to avoid additional costs.

3. Key Considerations

  1. Safety Regulations
    Non-professionals are not allowed to participate in the installation, especially staying away from the lifting area. During the installation of foldable containers, non-staff members should stay away from the installation area.

  2. Costs and Additional Items
    Installation costs usually do not include transportation, lifting equipment, floor hardening, cable distribution boxes, etc. The quotation range needs to be confirmed with the manufacturer in advance. For example, shelves and temperature monitoring systems for refrigerated containers are additional services.

  3. Compliance
    Choose manufacturers with third-party safety inspection documents to ensure that fire and wind resistance performance comply with standards such as the "General Technical Conditions for Prefabricated Integrated Houses" (JG/T550—2025).