How to Install Mobile Toilets in Nanchong
The installation of mobile toilets in Nanchong can be provided as a one-stop service by leasing or sales companies. If you need to install them yourself, you can refer to the following general steps:

Foundation Preparation
Before installation, ensure that the ground conditions meet the requirements. The ground must be dry, level, and free of debris. If there are potholes or slopes on the ground, hardening treatment (such as pouring concrete) should be carried out in advance to prevent deformation of the toilet frame or loosening of connecting parts due to uneven force. For example, in outdoor scenarios like scenic spots, special attention should be paid to the design of drainage slopes to prevent water from seeping into the foundation structure.
Frame Assembly
The main frame of a mobile toilet is usually welded from channel steel, square steel, and other steel materials and should be assembled step by step according to the instructions.
- Bottom Frame: First, fix the bottom crossbeams and longitudinal beams, ensuring that the levelness error does not exceed ±5mm. Use a level to calibrate and then tighten the bolts.
- Column Installation: Insert the columns vertically into the reserved holes at the bottom and reinforce them with corner brackets or welding. Pay special attention to checking the perpendicularity of the columns to the ground to avoid deviations in the subsequent wall installation.
- Overall Reinforcement: After the frame is assembled, conduct a secondary inspection of key nodes (such as corners and load-bearing parts) to ensure that there are no cracks or deformations in the steel.
Wall Installation
Wall materials are mostly color-coated steel plates, stainless steel plates, or fiberglass-reinforced plastics, and the fixing method should be selected according to the material characteristics:
- Color-Coated Steel Plates: Use self-tapping screws to fix them to the frame, with a spacing of 20-30cm. Sealant should be applied at the edges to prevent rainwater penetration.
- Stainless Steel Plates: Adopt welding or riveting processes, with special attention paid to the joints to ensure a flat and seamless surface.
- Sealing Inspection: After wall installation, conduct sealing tests on doors, windows, ventilation openings, and other parts to prevent odor leakage or rainwater backflow.
Internal Configuration
Depending on the model, facilities such as toilets, washbasins, and lighting need to be installed:
- Basic Model: Ordinary toilets need to be connected to the sewage pipe, and washbasins need to be connected to the water inlet pipe. The drainage slope should be ≥2% to ensure smooth water flow.
- Luxury Model: If it includes barrier-free equipment for the disabled (such as handrails and low-level washbasins), the height and spacing should be adjusted according to the Barrier-Free Design Code. For example, the diameter of handrails should be 30-40mm, and the height from the ground should be 700-850mm.
- Electrical Safety: Lighting and sockets should be equipped with leakage protection devices, and the wiring should be hidden inside the walls to prevent the risk of electric shock due to exposed wires.
Commissioning and Inspection
After installation, a comprehensive functional test should be carried out:
- Structural Stability: Gently push the four corners of the toilet to check for any shaking or abnormal noises.
- Drainage System: Pour water into the toilet and washbasin to observe whether the sewage pipe is blocked and whether the drainage speed of the floor drain meets the standard.
- Sealing: Close the doors and windows and spray smoke to check for any leakage points.
If you lack installation experience, it is recommended to contact local service providers in Nanchong (such as Chengfeng Mobile Toilet Leasing Company) for professional services. Their teams have installation experience in scenarios such as scenic spots and construction sites, which can shorten the construction period and reduce safety risks. For example, during the peak season in scenic spots, professional teams can complete the installation within 3 days and quickly dismantle and transport them away after the peak season to avoid resource idleness.
You may also like

Portable Toilet Rental for Construction Sites: What to Consider
Read More
Portable Toilet Rental Price Guide: Budget, Mid-Range & Premium
Read More
Portable Toilet Color Steel: A Practical Buyer's Guide
Read More