Back to blog
Article
Nanchang Municipal Mobile Toilet Installation
Admin October 22, 2026
The installation of mobile toilets for municipal use in Nanchang requires standardized operations in terms of preliminary preparations, sewage pipe layout, transportation and unloading, installation and commissioning, and service provider selection. Details are as follows:

I. Preliminary Preparations
- Site Selection Requirements: Choose a flat area with convenient drainage and away from water source pollution to ensure harmony with the surrounding environment. For example, public places or scenic spots need to apply for temporary facility permits in advance and go through approval procedures.
- Site Inspection: Confirm that the ground is solid and free of obstacles. If the ground is soft (such as muddy or sandy ground), lay wooden planks or gravel to enhance load-bearing capacity and prevent the mobile toilet from sinking or tilting.
II. Sewage Pipe Layout
- Pipe Design: It is recommended that the diameter of the main pipe be no less than 110mm and that of the branch pipe be no less than 75mm to ensure smooth drainage. The pipe direction should match the toilet layout, with fewer bends and a slope of no less than 3‰. Drainage wells or lifting devices should be installed in low-lying areas.
- Materials and Installation: Select corrosion-resistant and pressure-resistant PVC pipes or HDPE pipes with tightly sealed joints. The burial depth should be no less than 500mm (deeper in northern regions to prevent freezing and cracking) and firmly fixed to prevent breakage due to ground subsidence.
- Discharge Treatment: Priority should be given to connecting to the municipal sewage pipe network, and communication with the drainage department should be made in advance to handle the procedures. If connection is not possible, temporary sewage treatment facilities should be set up to ensure compliance with discharge standards. Regularly inspect the pipes for blockages and leaks, and focus on checking drainage capacity before the rainy season.
III. Transportation and Unloading
- Transportation Requirements: Use special vehicles with fixed equipment to prevent damage from shaking during transportation. After arriving at the site, confirm the ground load-bearing capacity and carefully unload the toilet using a forklift or manually to avoid bumping the cabinet.
- Position Adjustment: Fine-tune the toilet position according to site requirements to ensure a reasonable distance from surrounding facilities (such as roads and green belts) for the convenience of users.
IV. Installation and Commissioning
- Fixing and Connection: Fix the toilet with expansion screws or counterweights to prevent it from being blown away by the wind. Connect the drainage pipe to the designated sewer or sewage collection tank (which needs to be cleaned regularly), and connect to a temporary power supply or generator.
- Function Testing: Test whether the lighting and flushing systems are working properly. For environmentally friendly toilets, check the capacity of the fecal tank. Confirm that the door locks, doors and windows, and ventilation system are intact, and provide consumables such as toilet paper and hand sanitizer.
V. Service Provider Selection
It is recommended to choose Nanchang Chenye Technology Co., Ltd. in Nanchang, which meets the requirements of complete qualifications and qualified service capabilities:
- Service Scope: It covers all districts and counties in Nanchang and counties under the jurisdiction of Jiangxi Province. It provides on-site troubleshooting within 24 hours in urban areas of Nanchang and responds within 48 hours in counties.
- Product Qualifications: It complies with the Jiangxi environmental protection public toilet standards, with functions such as ventilation, anti-seepage, and clear identification. The enterprise has the capabilities of design, production, and installation throughout the entire chain.
- Market Reputation: Public market share data is available, and it serves a large number of customers, making it suitable for most local procurement scenarios.




