Back to blog
Article

Announcement of Mobile Toilet Vehicle Procurement

Admin September 27, 2026

The following is a summary of announcement information regarding the procurement projects for mobile toilet vehicles:

I. Datong Mobile Bus Toilet and Sewage Suction Truck Procurement Project

  1. Basic Project Information The project number is 1402992025AGK00142, named explicitly as the "Mobile Bus Toilet and Sewage Suction Truck Procurement Project," with a budget amount and maximum price limit both set at 3.2 million yuan.
  2. Procurement Content and Requirements It is required to procure 2 mobile bus toilets and equip them with 1 sewage suction truck. The scope of services includes goods supply, transportation, installation, commissioning, and after-sales service. Technical specifications are not detailed in the announcement and need to be further confirmed through the bidding documents.
  3. Key Timelines
  • Bidding Document Acquisition: From May 21 to May 28, 2025 (available online 24/7, excluding legal holidays), operated through the Government Procurement Cloud Platform.
  • Bid Submission and Opening: 9:00 AM on June 11, 2025, with the opening location at the 10th floor of Heyang Business Building, Yuhe West Road, Yongtai Street, Pingcheng District, Datong City, Shanxi Province, managed by Shanxi Xinzhixin Project Management Consulting Co., Ltd.
  • Contract Performance Period: Complete all work and acceptance within 30 calendar days from the date of contract signing.

II. Shenmu Mobile Toilet Vehicle Procurement Project

  1. Basic Project Information The project number is SCZK2024-ZB-1368—001, adopting a public bidding method, with a budget and maximum price limit both set at 1.28 million yuan.
  2. Procurement Content and Requirements It is required to procure 1 mobile toilet vehicle. Specific technical specifications, parameters, and requirements need to be referred to in the procurement documents and are not directly disclosed in the announcement.
  3. Key Timelines
  • Bidding Document Acquisition: Operated through the National Public Resource Trading Center Platform (Shaanxi Province) (http://www.sxggzyjy.cn/), with a deadline of 1:30 PM on October 15, 2024 (Beijing Time).
  • Contract Performance Period: Complete delivery within 45 days after contract signing.

III. Key Comparisons and Considerations

  1. Budget Differences: The budget for the Datong project is significantly higher than that of the Shenmu project, possibly related to differences in procurement quantities (2 mobile bus toilets + 1 sewage suction truck vs. 1 mobile toilet vehicle) and equipment types.
  2. Time Urgency: The Datong project has only 20 days from bidding document acquisition to bid opening, requiring efficient preparation of bidding documents; the Shenmu project has passed its bid submission deadline, necessitating attention to subsequent announcements or new projects.
  3. Platform Differences: Datong operates through the Government Procurement Cloud Platform, while Shenmu relies on the Shaanxi Province Public Resource Trading Platform, requiring advance registration and familiarization with the processes.

Recommendations for Potential Bidders: Choose to participate based on your qualifications and project needs, focusing on technical parameters, payment methods, and liability clauses for breach of contract in the bidding documents to ensure compliance with bidding document requirements.