Mobile Toilet Restroom Acceptance
The acceptance of mobile environmental-friendly public toilets should be comprehensively carried out from five aspects: action process, functional verification, record management, problem handling, and handover re-inspection, to ensure that the public toilets meet the requirements of the procurement contract and have safe and easy-to-maintain usage conditions.

I. Acceptance by Action Process Categories
The acceptance should cover six types of actions: entry, use, cleaning, replenishment, maintenance, and relocation. For example, during the entry phase, it is necessary to check whether the door lock opens and closes smoothly and whether the passage width meets the requirements for wheelchair access. During the use phase, it is necessary to verify the flushing pressure of the sanitary ware and the drainage speed of the sink. During the cleaning phase, it is necessary to test the floor's slip resistance and ease of cleaning. During the replenishment phase, it is necessary to confirm whether the replenishment interfaces for consumables such as toilet paper and hand soap are convenient. During the maintenance phase, it is necessary to check the opening method of the equipment compartment door and whether the internal piping layout is reasonable. During the relocation phase, it is necessary to evaluate whether the overall structure of the public toilet is easy to lift and transport.
II. On-Site Verification of Functional Systems
The water supply and drainage system should be tested for smooth flushing and drainage without leakage or odor. The ventilation system should be checked to ensure that the air exchange rate meets the standards and that fragrances are not used to mask inadequate ventilation. The lighting system should be verified for uniform brightness and whether the emergency lighting can activate automatically. The door locks should be tested for locking stability to prevent accidental opening or jamming. For cleaning and maintenance, it is necessary to confirm whether the floor and wall materials are corrosion-resistant and whether the garbage collection devices are sealed to prevent overflow. All functional verifications should be carried out by professionals, and detection reports should be provided for electrical wiring and lifting structures.
III. Detailed Record-Keeping and Associated Management
Record the public toilet number, dimensions, door and window types, sanitary ware brands, floor materials, signage content, and accompanying items (such as tools and spare parts) for each toilet. The records should indicate the confirmers (such as the construction party and supervision party) and the backfill time. Photos, readings (such as water pressure gauge values), and drawings should be associated using the same number to ensure information traceability. For example, a public toilet numbered 'MT-001' has dimensions recorded as 'Length 3m × Width 2m × Height 2.8m', with a floor material of 'non-slip floor tiles', accompanied by on-site photos and material certificates.
IV. Problem Handling and Safety Inspection
It is strictly prohibited to use fragrances or surface cleaning to cover up ventilation or drainage defects; actual data should be detected through professional equipment. From the user's perspective, check whether the space is cramped and whether the operations are convenient (such as the height of the flush button). From the cleaner's perspective, check whether the interfaces are easy to disassemble and whether the maintenance tools are complete. For items that do not meet safety, interface, or maintenance conditions, the reasons should be directly marked (such as 'Insufficient ventilation; additional exhaust fans required') and rectified within a specified time limit.
V. Handover Re-inspection and Document Archiving
After rectification, a re-inspection should be carried out according to the original action process to confirm that the problems have been resolved. During handover, keys, a list of spare parts, operation manuals, and daily inspection forms should be provided. On-site photos should be taken from a fixed angle (such as 45 degrees directly in front) and labeled with the object number. The final acceptance report should include a description of the consistency of the quantity and specifications of the goods with the contract, an assessment conclusion on the product's appearance, performance, and quality, and should be signed and confirmed by both parties.