Back to blog
Article

Mobile Toilet Procurement Acceptance Form

Admin October 11, 2026

The following is the content of the mobile toilet procurement acceptance form:

Purchaser: Xixia County Urban Sanitation and Environmental Center, as the demander for this mobile toilet procurement, is responsible for proposing procurement requirements and organizing acceptance work.

Winning/Successful Supplier: Henan Xujia Environmental Protection Technology Co., Ltd. This company stood out among numerous competitors with its own strength and successfully won the bid for this mobile environmental public toilet procurement project, undertaking tasks such as the production, supply, and installation of mobile toilets.

Procurement Project Name: Mobile environmental public toilets, which clearly defines the core product of this procurement and aims to provide environmentally friendly and convenient public sanitation facilities for specific areas.

Project Number: 2023 - 46. This number is used to uniquely identify the procurement project, facilitating queries and traceability in procurement management, file management, and other work.

Procurement Project Content:

  • Quantity: A total of three mobile environmental public toilets are procured to meet the usage needs in a certain area.
  • Specifications and Model: Each mobile toilet is equipped with 2 squatting positions, 1 management room, and 1 third toilet. The dimensions are 650022003000. This specification design takes into account both functionality and the rationality of spatial layout.
  • Procurement Contract Amount: A total of 405,000.00 yuan (in words: Four hundred and five thousand yuan only), which clarifies the capital investment for this procurement project.

Acceptance Situation:

  • Acceptance Criteria: The quantity and specifications of the goods must be consistent with the content specified in the procurement contract. The product appearance should be intact and aesthetically pleasing, with excellent performance and no quality issues. This is an important basis for ensuring that the procurement project achieves the expected results.
  • Acceptance Conclusion: After inspection, the quantity and specifications of the goods are consistent with those specified in the procurement contract, and there are no damages or shortages, indicating that the mobile toilets procured this time meet the acceptance criteria.
  • Signatures of Acceptance Leaders: Li Wei and Jin Xinyu, as the acceptance leaders, confirm and sign the acceptance results, reflecting the rigor and standardization of the acceptance work.