The number of floors at which mobile toilets are installed varies depending on the type of building and relevant regulations, as detailed below:

I. Requirements for Mobile Toilets on Construction Sites The installation of mobile toilets on construction sites must be aligned with construction safety regulations and practical needs. According to the requirements of the Inspection Standard for Construction Safety (JGJ59-2011), for high-rise building construction exceeding 8 floors, mobile toilets must be installed every four floors. For example, if a building has a total of 12 floors, mobile toilets should be installed on the 8th and 12th floors; if the total is 20 floors, they should be installed on the 8th, 12th, 16th, and 20th floors. This regulation aims to ensure that construction workers can access sanitary facilities promptly during vertical operations, reducing time wastage and safety hazards caused by traveling back and forth to the ground level.

II. Requirements for Mobile Toilets in Super High-Rise Buildings For super high-rise buildings (typically those exceeding 100 meters in height), the installation of mobile toilets must adhere to stricter regulations. According to Article 6.6.3 of the Unified Standard for Civil Building Design (GB50352-2019), super high-rise buildings should have a mobile toilet installed every three floors. For instance, if a building has a total of 50 floors, mobile toilets should be installed on the 3rd, 6th, 9th... up to the 48th floors. Given the high occupancy and significant vertical traffic pressure in such buildings, densely installing mobile toilets can effectively alleviate usage pressure while meeting fire evacuation and emergency management requirements.

III. Differences in Regulations and Applicable Scenarios The differences in mobile toilet installation requirements between construction sites and super high-rise buildings primarily stem from variations in usage scenarios and functional needs. Construction sites prioritize construction efficiency, balancing the coverage of sanitary facilities with construction costs; whereas super high-rise buildings must consider daily usability convenience, fire safety, and emergency response capabilities. Therefore, the former adopts a lenient standard of "installation every four floors," while the latter employs a stricter standard of "installation every three floors."

IV. Other Considerations In practical installation, factors such as the capacity of mobile toilets, ventilation conditions, and frequency of cleaning and maintenance must also be considered. For example, mobile toilets on construction sites should be equipped with odor control devices and regular cleaning services, while those in super high-rise buildings should be compatible with the building's drainage system and have clear signage. Additionally, some regions may impose additional requirements on the materials and structure of mobile toilets based on climatic characteristics (e.g., high temperatures, heavy rainfall).