Mobile Toilet Factory Acceptance Form
The mobile toilet factory acceptance form should be designed comprehensively by combining acceptance criteria, key milestones, and a recording framework. Below is a reference template and explanation:

I. Basic Information Section It is necessary to clarify core data such as the purchaser, supplier, project name, quantity, specifications and model (e.g., '4 squatting positions + 1 management room, dimensions 6000×2500×3200mm'), and contract amount. This section can refer to the example of the mobile environmental protection public toilet acceptance form to ensure consistency with the contract terms and avoid subsequent disputes. For example, if the contract specifies the use of stainless steel material, the material inspection report and actual materials used should be verified during acceptance.
II. Acceptance Criteria and Process
- Quantity and Specification Verification: Check the number of modules such as squatting positions, management rooms, and third restrooms in the mobile toilet against the contract list, and measure whether the actual dimensions meet the design requirements (e.g., length error ≤ 50mm).
- Appearance and Structure Inspection: Check whether the outer shell is flat and free of scratches, whether the doors and windows open and close smoothly, whether the welds are firm and free of rust, and whether the non-slip floor is properly installed.
- Functional Performance Testing:
- Ventilation System: Start the exhaust fan and use an anemometer to check whether the air exchange rate meets the standard (e.g., ≥ 8 times per hour);
- Drainage System: Simulate use and check the tightness of the sewage tank to ensure no leakage;
- Electrical Safety: Test the insulation resistance of circuits such as lighting and sockets (should be ≥ 0.5MΩ) and whether the ground wire is reliably connected.
- Safety and Convenience Verification: Check whether emergency call devices, barrier-free handrails, anti-odor floor drains, and other configurations are complete, and whether night lighting covers all passageways.
III. Recording and Signing Section
- Original Data Recording: Record details such as door and window dimensions, sanitary ware brands (e.g., TOTO), and water tank capacity according to the six types of actions: 'entry, use, cleaning, replenishment, maintenance, and relocation' to provide a basis for subsequent maintenance.
- Acceptance Opinion Filling: The construction unit should conduct a self-inspection and fill in 'meets design requirements'. The supervision agency should review and sign 'agree to acceptance' or 'requires rectification' opinions, and both parties should stamp and confirm.
- Retention and Archiving: The form should be made in duplicate, with one copy retained by the purchaser and the other by the supplier. The electronic version should be backed up to the cloud to ensure traceability.
IV. Precautions If the supplier does not provide a standardized template, you can contact companies such as Henan Xujia Environmental Protection Technology Co., Ltd. for acquisition. During acceptance, avoid only checking the appearance; it is necessary to focus on verifying the performance of hidden projects such as ventilation and drainage to ensure the long-term stable operation of the mobile toilet.