The content of mobile toilet construction contracts varies depending on the type. Common types include supply contracts for mobile public toilet procurement projects, maintenance agreements for mobile restrooms, and model construction contracts for village-level toilets (in the form of leasing agreements). Here is a detailed introduction:

Supply Contract for Mobile Public Toilet Procurement Projects

  • Contracting Parties: The demand side and the supply side, such as the Environmental Sanitation Service Center of Qibin District, Hebi City, and Hebi Xingheng Industrial Co., Ltd.
  • Contract Amount: It covers expenses for toilet installation, ancillary infrastructure, and internal facilities. For example, the contract amount in one case was seven hundred and eighty-six thousand yuan in total.
  • Procurement Content: It specifies the quantity, unit price, and total amount of mobile public toilets of different specifications, such as 4 mobile public toilets with the configuration of 1 (management room) + 2 (toilet compartments) + 1 (third toilet).
  • Quality Requirements: The goods must be in stock, brand-new, and meet the specified models and technical indicators. Spare parts, accessories, and tools shall be provided as promised in the supplier's bid documents. The after-sales service warranty period is 1 year, with free maintenance during the warranty period.
  • Supply Time, Location, and Method: The supply and installation period shall be completed within a certain time after the contract is signed, such as 60 days. The supply location is the place designated by the demand side. The supplier shall bear the costs related to transportation and installation, and the packaging standards shall comply with national regulations.
  • Acceptance Method and Responsibility Assumption: The acceptance time is within a certain time after installation is completed, such as 7 days. The acceptance standards shall be implemented according to the bidding parameters and the plan selected by the demand side. The supplier shall bear the losses if the acceptance fails.
  • Payment Method: After the supply and installation are completed and the acceptance is passed, the supplier shall provide a formal invoice, and the demand side shall pay 100% of the contract amount.
  • Liability for Breach of Contract: If the supplier fails to supply the goods on time, its winning qualification will be canceled, it shall compensate for the losses, and it will not be allowed to participate in relevant government procurement activities within the specified time.

Maintenance Agreement for Mobile Restrooms

  • Contracting Parties: Party A (the entrusting party) and Party B (the maintenance party).
  • Maintenance Scope: It includes the inspection and repair of the main structure, piping system, electrical system, sewage system, etc., as well as other necessary work.
  • Maintenance Period: It shall be carried out as soon as possible from the date of contract signing. Party B shall start and complete the maintenance work within a certain time, such as starting within 10 working days and completing within 30 working days. Special circumstances can be extended through negotiation.
  • Maintenance Costs and Payment Method: It includes material costs, labor costs, etc. Party A shall pay an advance payment first, and pay the remaining amount after the maintenance is completed and passes the acceptance. Party B shall provide a formal invoice after receiving the advance payment.
  • Quality Assurance: Party B guarantees the maintenance quality and provides a one-year warranty service. Non-human-caused failures will be repaired free of charge. Party A shall notify Party B in a timely manner if any problems are found, and Party B shall repair them as soon as possible.
  • Liability for Breach of Contract: If either party fails to pay the amount or complete the work on time as agreed, a penalty of 0.5% of the total contract amount shall be paid for each day of overdue payment. If a breach of contract is caused by force majeure factors, it shall be resolved through friendly negotiation.
  • Dispute Resolution: First, try to resolve it through friendly negotiation. If the negotiation fails, file a lawsuit with the people's court at the place where the contract is signed according to law.

Model Construction Contract for Village-Level Toilets (in the Form of a Leasing Agreement)

  • Contracting Parties: Party A (the lessor) and Party B (the lessee).
  • Leasing Content: Party A leases mobile toilets according to the style and the number of squatting positions selected by Party B.
  • Transportation Method: Party B shall pick up and transport the toilets by itself or entrust Party A to handle the transportation (the freight shall be borne by Party B).
  • Preparations by Party B: Before leasing, Party B shall check the appearance and equipment of the toilets and prepare the water supply and drainage pipelines and power supply in advance. Party A shall provide free guidance for installation.
  • Ownership and Right of Use: During the leasing period, the ownership belongs to Party A, and Party B has the right of use. Party B shall not dispose of them without authorization.
  • Leasing Period and Rent: The calculation method of the leasing period shall be clearly specified, and the rent shall be calculated on a daily basis, with additional hoisting and transportation fees.
  • Loss Assumption: During the leasing period, losses such as damage and loss shall be borne by Party B, and the value of the goods shall be based on the list.
  • Security Deposit and Down Payment: Party B shall pay a security deposit and a down payment when signing the agreement.
  • Entry into Force and Termination: The agreement shall take effect when Party A receives the security deposit for the goods and shall terminate when the goods are returned intact.
  • Dispute Resolution: An application for arbitration can be made to the arbitration committee or a lawsuit can be filed with the people's court.