Installation Diagram for the Bottom of Mobile Toilets
Currently, there is no direct installation diagram for the bottom of mobile toilets, but installation key points can be summarized based on relevant installation descriptions:

The installation of mobile toilets involves multiple critical steps, with operations varying depending on the type and installation scenario.
For mobile toilets such as rural integrated restrooms, the installation of the bottom support feet is crucial. If the lengths of the support feet are inconsistent, a cutting machine should be used to adjust them to ensure uniform length. This guarantees the stability of the mobile toilet after installation, preventing shaking or tilting due to uneven support feet.
When installing the mobile toilet bowl, the installation of the toilet flange is a core step. First, the toilet flange should be installed accurately, ensuring that the center of the flange aligns precisely with the center of the sewer pipe. Then, the toilet bowl should be placed correctly. The accuracy of this step directly affects the sealing and drainage performance of the toilet bowl. If the flange and sewer pipe centers are not aligned, it may lead to sewage leakage, unpleasant odors, and a negative impact on user experience and environmental hygiene.
In cases where the toilet bowl needs to be relocated across floors, a relocation device is required. The ground floor slab should be chiseled out to a depth of 20 - 40mm, and then the relocation device should be pre-embedded. The depth of chiseling must be strictly controlled; if it is too shallow, the relocation device may not be securely installed, while if it is too deep, it may damage the floor slab structure and affect building safety. After pre-embedding the relocation device, ensure tight connections to prevent sewage leakage.
For scenarios involving same-floor drainage with an elevated floor slab for relocation, a bottom platform should be constructed using lightweight blocks. The height of the bottom platform is generally 180 - 200mm, and a sewage pipe should be pre-embedded within it. The selection of lightweight blocks should comply with building codes to ensure their strength and stability. When constructing the bottom platform, ensure its flatness and perpendicularity. When pre-embedding the sewage pipe, pay attention to the pipe's slope to ensure smooth sewage discharge and prevent blockages.