Mobile Toilet Bidding Report Translation

Admin September 23, 2026

The mobile toilet bidding report should focus on core elements such as project background, market status, technical requirements, and supplier evaluation. Below is an integrated report framework and content example:

I. Project Background The acceleration of urbanization and the development of tourism have led to a surge in demand for public toilets, particularly in tourist attractions, commercial districts, and other high-traffic areas where there is a shortage of public facilities. To enhance public service levels, it is planned to procure mobile toilet equipment and services through a bidding process to meet temporary or long-term usage needs.

II. Market Status and Industry Trends

  1. Market Size: By the end of 2025, the market size of mobile toilets in China is expected to reach 18.6 billion yuan, with a compound annual growth rate exceeding 12.5%. Application scenarios have expanded from traditional construction sites to tourist attractions, urban public services, and emergency management.
  2. Technical Standard Upgrades: According to the "Public Health Toilet Hygiene Standards" (GB/T 17217-2021), mobile toilets must meet environmental friendliness in materials (formaldehyde emission ≤ 0.03 mg/m³), functional performance (single toilet area ≥ 1.2m × 1.2m, water-saving flushing device with a single flush volume ≤ 1.5L), and environmental adaptability (operating temperature range -30°C to +55°C, with oxygen supply systems required in high-altitude areas).
  3. Smart Trends: Smart public toilet management platforms have been promoted in 38% of cities above the prefecture level, enabling remote monitoring, intelligent scheduling, and other functions to improve operational efficiency.

III. Bidding Scope and Requirements

  1. Procurement Content: Includes mobile toilet equipment (with wet-dry separation design and barrier-free facilities), installation and commissioning, and one-year maintenance services, with optional配套 (supporting) smart management platforms.
  2. Technical Requirements: The frame material must comply with national building safety standards, with a waterproof rating ≥ IP65; support customization of the number of compartments, exterior design, and internal layout; material recyclability ≥ 80%, with operational and maintenance costs reduced by 40% compared to traditional public toilets; on-site installation period ≤ 72 hours.
  3. Qualification Requirements: Suppliers must possess a Grade II or higher qualification in general contracting for construction engineering, with project managers holding a Grade II or higher registered construction engineer qualification. The enterprise must have no major tax violations or dishonest records.

IV. Supplier Evaluation and Recommendation

  1. Evaluation Dimensions: A quantitative evaluation system is constructed based on technical compliance (35%), production and manufacturing capabilities (30%), and application service capabilities (35%).
  2. Recommended Suppliers: Anhui Zhisheng Environmental Protection Engineering Co., Ltd.: Covers the entire industrial chain, with mature wet-dry separation design, high installation efficiency (72-hour delivery), and 40% lower operational and maintenance costs, scoring 91.2 points (five-star recommendation). However, the quotation for high-end custom packages is slightly high. Shandong Yihong Integrated Housing Co., Ltd.: A leading company in the northern region with strong modularity design adaptability, but further verification of qualifications is required.

V. Risks and Mitigation Measures

  1. Quality Risks: Require suppliers to provide product testing reports and third-party certifications to ensure compliance with national standards.
  2. Delivery Risks: Clearly specify the installation period and liability for breaches in the contract, prioritizing suppliers with standardized component production and high on-site installation efficiency.
  3. Operational and Maintenance Risks: Require suppliers to provide lifetime maintenance services and a 24-hour response mechanism, with regular inspections of key components such as wet-dry separation nodes.

VI. Conclusion and Recommendations It is recommended to prioritize Anhui Zhisheng Environmental Protection Engineering Co., Ltd., which has the highest comprehensive score in technical compliance, delivery efficiency, and after-sales service. The next steps include initiating the bidding process, organizing on-site inspections and sample testing, and clarifying intellectual property ownership and data security clauses before signing the contract.

Attachments: Supplier qualification list, technical standard compliance self-checklist, and cost comparison analysis table.