Mobile Sanitary Toilet Procurement
Admin October 16, 2026
The procurement of mobile sanitary toilets requires a comprehensive consideration of factors such as project requirements, budget, supplier qualifications, and market prices. The following provides explanations from the perspectives of different procurement project cases and market price references:

I. Government Procurement Project Case References
Procurement Project of the Tangwang County Municipal Sanitation Service Center
- The winning supplier is Bokun (Heilongjiang) Intelligent Equipment Manufacturing Co., Ltd. The procured brand is Shenglonghua, including three specification models:
- BK Mobile Public Toilet 260901: Dimensions are 8.0 meters × 3.1 meters × 3.12 meters, with a unit price of 170,000 yuan, suitable for small- to medium-sized public places.
- BK Mobile Public Toilet 260902: Dimensions are 7.6 meters × 3.09 meters × 3.5 meters, with a unit price of 235,000 yuan, likely featuring more comprehensive configurations.
- BK Mobile Public Toilet 260903: Dimensions are 12.0 meters × 3.25 meters × 3.5 meters, with a unit price of 583,000 yuan, suitable for large-scale events or high-traffic scenarios.
- Characteristics: Government procurement projects must strictly follow the bidding process. The winning bid amount includes comprehensive costs such as products, transportation, and installation, making it suitable for scenarios with sufficient budgets and clear specification requirements.
- The winning supplier is Bokun (Heilongjiang) Intelligent Equipment Manufacturing Co., Ltd. The procured brand is Shenglonghua, including three specification models:
Procurement Project of the 338th Unit of the Hubei Bureau of the National Food and Strategic Reserves Administration
- The procurement method is inquiry-based, with the budget not disclosed. However, it explicitly requires suppliers to meet the qualification conditions specified in Article 22 of the Government Procurement Law, including independent legal entity status and no major illegal records.
- Key Timeline: Document acquisition period is from October 29, 2025, to November 3, 2025, with the response document submission deadline at 09:30 on November 3.
- Characteristics: Suitable for scenarios with limited budgets or strict requirements for supplier qualifications, requiring a focus on qualification reviews and response document submission requirements.
II. Market Price References
Market product prices vary significantly, and selections should be based on functional requirements:
- Simple Type: For example, Dezhou Zhaohui Intelligent Technology Co., Ltd. offers 270 yuan/set, and Weifang Hengyuan Environmental Protection offers 120 yuan/set. These are mostly single-toilet units or basic configurations, suitable for temporary construction sites or low-traffic scenarios.
- Multi-functional Type: For example, Xiamen Topra Material Technology Co., Ltd. offers 7,400 yuan/set, and Beijing Jindongfang Environmental Landscape Engineering Co., Ltd. offers 8,599 yuan/set. These may include advanced functions such as shower rooms and microbial treatment, suitable for scenic spots or long-term use scenarios.
- Customized Type: For example, Chengdu Guya Integrated Housing Co., Ltd. supports customization based on drawings, with prices starting at 161.5 yuan/set, allowing adjustments to dimensions and functions according to site requirements.
III. Procurement Recommendations
- Clarify Requirements: Determine the number of toilet units, functional configurations (such as whether a shower or fecal tank treatment is needed), and budget range based on the usage scenario (such as scenic spots, construction sites, or events).
- Qualification Review: Government procurement requires strict verification of supplier qualifications. For market procurement, it is recommended to choose merchants with after-sales guarantees (such as 7-day replacement and 48-hour delivery).
- Cost Comparison: Government procurement projects need to consider comprehensive costs (including transportation and installation). For market procurement, priority can be given to products in stock or with short delivery cycles to save time costs.