Back to blog
Article
Meishan Container House Installation
Admin September 15, 2026
The installation of container houses in Meishan requires a combination of professional design, standardized processes, and localized services. The key points are as follows:

I. Pre-installation Preparation
- Site Planning: Choose a flat, well-drained ground to avoid the risk of foundation settlement. For long-term use, it is recommended to pour a concrete foundation; for temporary use, steel base frames or workbenches can be used. For example, the installation of residential containers provided by Meishan Ruicheng Rock Wool Purified Color Steel Plate Co., Ltd. requires ensuring that the ground bearing capacity meets the requirements.
- Design Confirmation: Select the structural type according to the purpose (such as construction site dormitories, homestays, commercial buildings). Meishan Shuxinju Mobile Housing Co., Ltd. offers customized design services, which can optimize the plan according to the needs of wind resistance, waterproofing, and thermal insulation. Especially in view of the characteristics of heavy rainfall and large temperature differences in Sichuan, the thickness of the waterproof layer and thermal insulation layer needs to be strengthened.
- Materials and Tools: Prepare connecting parts such as hexagon socket bolts, self-tapping screws, round-head drill tail wires, and cross-head flat-tail swallow-tail wires, as well as materials such as floor base plates (such as magnesium oxide boards) and PVC floor adhesives. Tools include electric wrenches, spirit levels, and chalk line instruments.
II. Installation Process
- Base Frame Assembly: Connect the box bottom corners with the base beams, and fix them with hexagon socket bolts but do not tighten them temporarily; adjust the diagonal error of the base frame to be ≤3mm and then lock the bolts.
- Secondary Beam and Floor Installation: Install π-shaped secondary beams according to the positioning holes and fix them with self-tapping screws; lay the floor base plates and align the cut corners, snap the chalk line along the center line of the π-shaped beams and then fix them with nails, with a nail spacing of 300-350mm.
- Wall and Roof Installation: For foldable containers, first unfold the main frame and place the support rods, and then push open the walls with doors and windows one by one and tighten the screws; for assembled containers, hoist the roof panels and connect the steel frame structures.
- Final Work: Polish the floor joints, brush PVC floor adhesive and then lay the floor glue, and weld the joints; check the compliance of the pre-buried water and electricity lines and fire protection facilities.
III. Selection of Localized Services
- Supplier Qualifications: Give priority to enterprises with steel structure construction qualifications, patented technologies, and implementation cases. For example, Sichuan Kuaizhu Integrated Housing Co., Ltd. holds more than 30 utility model patents and provides a full range of services from design to installation.
- Service Scope: Local service providers in Meishan (such as Zhuoming Container and Team Xiao) can provide full-area services and shorten the response time; for foreign enterprises (such as Shenyang Yingchuang Color Steel Installation Co., Ltd.), it is necessary to confirm whether they support installation in the Meishan area and the transportation costs.
- Cost-effectiveness Consideration: The price of ordinary container houses is about 15,000 yuan per unit or more, and the transportation cost of foldable containers can be reduced by 4-5 times. The choice needs to be made according to the construction period and budget.
IV. Safety and Maintenance
- Installation Safety: Non-professionals should stay away from the hoisting area to avoid the risk of wire rope breakage or frame collapse.
- Use and Maintenance: Regularly check the anti-corrosion layer of the steel frame structure, the sealing of doors and windows, and the drainage system; in the Meishan area, it is necessary to focus on preventing rust caused by moisture.