Back to blog
Article

Longyan Mobile Toilet Bidding Plan

Admin October 09, 2026

The Longyan mobile toilet bidding plan needs to be formulated in combination with specific project requirements, covering procurement methods, technical parameters, supplier qualifications, implementation commitments, and management plans. The following is a detailed explanation:

I. Clarify Procurement Methods and Project Numbers Different projects adopt different procurement methods, which need to be selected according to project characteristics. For example, the project of the Jiaoyang Industrial Zone Management Committee in Shanghang County adopts inquiry procurement, with the project number being FJSYXM2020004; the sports field project of the Affiliated High School of Longyan University adopts competitive bidding procurement, and the process needs to be completed within the specified time (registration from June 27 to 29, 2023, and bidding on the 30th); the Wuping County Smart Cloud Toilet Project (Wan'an Area) adopts public bidding, with the project number being TRCG2024002-1 and the winning bid amount being 2,147,836.00 yuan. The bidding plan needs to clarify the procurement method, time nodes, and project number to ensure process compliance.

II. Refine Technical Parameters and Budgets Technical parameters need to be customized according to usage scenarios. For example, the project of the Affiliated High School of Longyan University requires the demolition of old toilets, installation of fiberglass septic tanks, procurement of box-type mobile integrated toilets, and provision of supporting water, electricity, and ventilation systems, with a total budget of 102,300 yuan; the Wuping County Smart Cloud Toilet Project involves goods procurement, and specific specifications and models need to refer to the bidding documents. The bidding plan should list technical requirements in detail to avoid ambiguity and set a reasonable budget ceiling.

III. Supplier Qualifications and Policy Implementation Suppliers need to meet the basic conditions of the Government Procurement Law (such as financial status and performance capabilities). Some projects have no specific qualification restrictions (such as the Shanghang County project), but it needs to be clarified whether joint bids are accepted. At the same time, policies such as energy-saving products, environmental label products, and support for small and micro enterprises need to be implemented. For example, the Shanghang County project requires suppliers to reflect support for relevant policies in their quotations.

IV. Project Implementation Commitments and Management Plans The bidding plan needs to include quality,工期 (construction period), and service commitments to ensure that the mobile toilets comply with national standards (such as GB/T 18092-2008) and industry norms, are delivered on time, and provide after-sales maintenance. In terms of management, a professional team needs to be established to formulate production, transportation, and installation plans, clarify short-term (such as completing installation within 30 days) and long-term (such as a one-year warranty period) goals, and establish a communication and coordination mechanism.

V. Staffing and Training Sufficient personnel should be allocated according to the project scale, such as clearly dividing the work among the production, installation, and after-sales teams. A training plan needs to be provided to ensure that personnel are familiar with technical specifications, safe operations, and emergency response procedures, guaranteeing the quality of project implementation and the efficiency of subsequent services.