Container House Construction in Lijizhen
When undertaking container house construction in Lijizhen, it is essential to pay close attention to the policies governing the renovation, expansion, and decoration of houses, and to follow the compliant approval process.

I. Policy Basis and Management Authority
According to the Notice on Establishing the Leading Group for the Management of House Renovation, Expansion, and Decoration in Lijizhen (Li Wei [2023] No. 21), Lijizhen has established a dedicated leading group responsible for coordinating the management of house renovation, expansion, and decoration across the town, including approval supervision, safety standards, and legality reviews. The office of this group is located in the Urban Construction Office, with Comrade Sun Sujing serving as the director, specifically coordinating information collection and reporting. If the container house involves structural modifications, changes to the exterior facade, or adjustments in usage, an application must be submitted to the Urban Construction Office for review by the leading group to ensure compliance with planning, safety, and environmental requirements.
II. Core Requirements for Compliant Construction
Planning and Land Use Compliance
Container houses must comply with the territorial spatial planning and rural construction requirements of Lijizhen. If located within the scope of rural collective construction land or homestead land, it is necessary to confirm whether the land nature permits temporary or permanent structures; if involving farmland or ecological protection zones, construction is prohibited. For example, the implementation of the Phase II project of the farmers' concentrated residential area in Zhoushan Village through public bidding indicates that the construction of concentrated residential areas must strictly follow the planning approval process.Safety and Quality Standards
According to the Implementation Plan for the Special Investigation and Rectification of Major Accident Hazards in Lijizhen (Li Zheng Fa [2023] No. 29), all house construction must meet seismic, fire safety, and structural safety standards. Container houses must provide structural design drawings, material qualification certificates, and undergo safety assessments by professional institutions to avoid insufficient load-bearing capacity or substandard fire performance due to modifications.Approval Process
Before construction, the following materials must be submitted to the Urban Construction Office of Lijizhen:
- Land use certificate or lease contract;
- Design drawings and construction plan for the container house;
- Safety assessment report;
- Owner's identification and application form.
The leading group will organize a joint review by multiple departments and issue a construction permit upon approval, incorporating the project into dynamic supervision.
III. Typical Case Reference
The Phase II project of the farmers' concentrated residential area in Zhoushan Village, Lijizhen, was awarded to Jiangsu Xingliang Construction Engineering Co., Ltd., with a construction period of 60 days and a winning bid of RMB 5.3872 million. The project determined the construction unit through public bidding and the separation of evaluation and determination (direct ballot method), clearly specifying the project location, scale, and quality requirements. Container house construction can refer to the compliant processes of such projects to ensure transparency and standardization in bidding, construction, and acceptance.




