The large-scale demolition of prefabricated panel houses is not a one-size-fits-all approach; instead, it adopts differentiated strategies based on the actual conditions of the houses.

I. General Principles for Renovation and Demolition
The 'Implementation Guide for Urban Renewal Actions' issued by the Ministry of Housing and Urban-Rural Development explicitly states to 'resolutely prevent large-scale demolition and construction' and advocates for a combination of 'preservation and renovation' and 'demolition and reconstruction'. According to the 'Summary of the Renovation of Old Urban Residential Communities in 2024', approximately 65% of renovation projects nationwide adopt preservation and renovation methods, while 35% adopt demolition and reconstruction methods. This ratio will remain relatively stable in 2025. The choice of renovation method is primarily based on the structural safety of the houses:

  1. Houses with good structural safety but outdated functions: Extend their service life through reinforcement and renovation, as well as functional upgrades (such as adding elevators and improving pipelines) to avoid resource waste.
  2. Houses with serious structural safety hazards: If they cannot meet safety requirements through reinforcement and repair, demolition and reconstruction will be implemented to ensure the safety of residents' lives and property.

II. Three Types of Houses Prioritized for Demolition
The following three types of prefabricated panel houses will be prioritized for demolition:

  1. Houses with damaged main structures that cannot be repaired: For example, the Changcheng Jiaoyuan Community in Yuecheng District, Shaoxing City, started demolition in September 2024 due to severe damage to its main structure, with a demolition area of approximately 15,000 square meters.
  2. Houses unable to withstand natural disasters: Even if the structure is not damaged, houses with insufficient earthquake resistance and flood control capabilities need to be demolished and rebuilt to enhance safety.
  3. Houses on land planned for municipal use: Prefabricated panel houses that need to be demolished to make way for urban development plans.

III. Compensation Methods for Residents
If a house is included in the demolition scope, residents can choose from the following three compensation methods:

  1. Monetary compensation: Calculated based on the prices of surrounding second-hand houses, including decoration compensation and moving expenses, to ensure that residents' economic interests are not compromised.
  2. Property rights exchange: Provides options for 'demolishing the old and replacing it with the new', including in-situ relocation (building new houses on the original site) or off-site resettlement (moving to new houses in other areas).
  3. Housing voucher compensation: Residents can use housing vouchers to purchase commercial housing in designated areas, flexibly meeting their housing needs.

IV. Policy Objectives and Implementation Cases
The Ministry of Housing and Urban-Rural Development plans to basically complete the task of renovating old urban residential communities built before the end of 2000 by the end of 2025, providing renovation opportunities for a large number of prefabricated panel houses that have been in service for more than 25 years. The policy balances safety needs and resource utilization through differentiated strategies. For example, the pilot project in Shaoxing City provides replicable experience for the whole country through its self-renewal model.