Back to blog
Article

Is the Price of Prefabricated Houses Expensive?

Admin September 18, 2026

The price of prefabricated houses is not expensive, and they offer significant cost advantages compared to traditional construction methods.

In the domestic market, the price range for prefabricated houses is quite broad, with prices per square meter ranging from 300 to 1200 yuan. Among them, the cheapest unfinished version costs only 300 yuan per square meter, making it highly suitable for temporary rural housing needs and capable of meeting basic living functions at a low cost. If the construction scale reaches more than 10 units, the price can be further reduced to 430 yuan per square meter, which can save a significant amount of money for users with bulk housing construction needs. Taking the construction of a 200-square-meter villa as an example, a prefabricated house can be built for only 210,000 yuan, while a traditional brick-and-mortar house would be 28% more expensive. This data visually demonstrates the significant price advantage of prefabricated houses.

In overseas markets, prefabricated houses also demonstrate extremely high cost-effectiveness. For example, a 70-square-meter prefabricated house, including basic living spaces such as a bedroom, kitchen, and independent bathroom, costs less than 16,000 US dollars. Even after adding freight, tariffs, and other miscellaneous expenses, the final price is close to 29,000 US dollars (equivalent to less than 200,000 yuan), a price that is acceptable to many overseas consumers. Additionally, although high-end customized prefabricated houses are relatively more expensive, some luxury models have a final price of just over one million US dollars and are fully equipped, including panoramic floor-to-ceiling windows, smart door locks, thermostatic showerheads, etc., providing users with a high-quality living experience.

In contrast, traditional construction methods in European and American countries are costly. Taking the United States as an example, construction workers are expensive, with a minimum daily wage of 200 US dollars, and it is not uncommon for skilled workers to earn 500 US dollars a day. Moreover, they work only 8 hours a day and leave on time, resulting in long construction periods and high costs. Prefabricated houses, on the other hand, adopt a factory-based production and on-site assembly approach, significantly shortening the construction period and reducing labor costs. Therefore, they are widely welcomed in European and American countries and have become a cost-effective choice for solving housing problems.