Back to blog
Article

Huoshenshan Hospital Mobile Toilets

Admin October 09, 2026

During the construction and operation of Huoshenshan Hospital, mobile toilets were deployed in multiple phases, effectively meeting the sanitation needs of personnel in different areas and supported by comprehensive maintenance measures.

Construction Site: Basic Support and Dynamic Management

In the early stages of Huoshenshan Hospital's construction, to address the sanitation needs of thousands of construction workers, the Environmental Sanitation Center of Caidian District Urban Management and Law Enforcement Bureau installed 4 mobile public toilets at the site. These toilets featured a modular design, enabling rapid deployment and easy relocation to accommodate the high-intensity construction demands. To prevent septic tank blockages, the sanitation center arranged for regular sewage suction and dredging by suction trucks, ensuring timely removal of waste and preventing environmental pollution. Additionally, dedicated personnel were assigned for daily sanitation and cleaning, including disinfection and waste removal, to reduce the risk of disease transmission. The focus of management during this phase was on rapidly responding to construction needs, covering core areas with a small number of fixed points while balancing efficiency and hygiene.

Hospital Periphery: Capacity Expansion and Flexible Adjustment

As hospital construction progressed, the number of peripheral staff (such as material transporters, security personnel, and volunteers) increased, making the existing toilet capacity insufficient. In response, Caidian Urban Management urgently mobilized 14 mobile public toilets from the evening of the 3rd to the morning of the 4th, installing them in two batches:

  • First Batch: At 10 PM on the 3rd, 10 toilets, 10 washbasins, and two 30-liter water heaters were put in place to meet basic sanitation and simple washing needs.
  • Second Batch: On the morning of the 4th, four additional independent mobile toilets were added to further disperse crowds and prevent gatherings.

Furthermore, management explicitly stated that adjustments would be made dynamically based on the needs of epidemic prevention personnel, such as adding more points during peak periods or replacing outdated equipment to ensure proper functionality. This phase was characterized by a combination of flexibility and foresight, adapting to personnel growth through phased capacity expansion while providing washing and hot water facilities to enhance the user experience.

Maintenance Measures: Hygiene and Epidemic Prevention in Tandem

All mobile public toilets adhered to strict maintenance standards:

  • Regular Sewage Suction: Septic tanks were cleaned immediately upon reaching capacity to prevent overflow.
  • Frequent Disinfection: High-contact areas such as toilet interiors and door handles were disinfected multiple times daily using chlorine-based disinfectants.
  • Waste Segregation: Dedicated trash bins were provided for waste collection, separating it from medical waste to prevent cross-infection.

These measures not only ensured the normal operation of the toilets but also supported the overall epidemic prevention efforts at Huoshenshan Hospital, demonstrating the deep integration of emergency facilities with public health management.