Customization of Mobile Toilets for Hunan Scenic Spots
The customization of mobile toilets for Hunan scenic spots involves stages such as demand communication, plan design, factory prefabrication, transportation, and installation. The customization cycle is approximately 7-15 days, and the specific process is as follows:

1. Demand Communication and Plan Design
Customization services usually start with communication about user demands, and the following core parameters need to be clarified:
- Size and Layout: Determine the overall size of the toilet (e.g., 10 meters long and 3 meters wide) and the internal functional partitions (e.g., the ratio of men's restrooms, women's restrooms, and accessible stalls) according to the tourist flow and usage scenarios in the scenic spot.
- Doors, Windows, and Electrical Circuits: Design the positions and opening methods of doors and windows (e.g., side-hung or sliding) and configure the internal electrical circuits (e.g., sockets, lighting, and reserved interfaces for air conditioners) to ensure electrical safety and convenience.
- Appearance and Signage: Select colors (e.g., wood-like or stone-like colors) and signage designs (e.g., LED light boxes or three-dimensional characters) in line with the theme of the scenic spot to enhance visual harmony.
Enterprises will provide reasonable plans based on on-site conditions (e.g., terrain and water and electricity access points). For example, Dezhou Hongtu Metal Products Co., Ltd. once customized a seven-shaped toilet for a customer in Hunan. The exterior wall used thermal insulation materials, and a marble countertop was installed in the middle, taking into account both practicality and aesthetics.
2. Factory Prefabrication and Production Cycle
After the plan is confirmed, it enters the factory prefabrication stage. The production cycle is generally 7-15 days, depending on the complexity of the plan:
- Structural Fabrication: Use light steel structures or modular frames to ensure stability and earthquake resistance.
- Material Processing: The exterior walls can be made of weather-resistant materials such as metal carved panels or aluminum-plastic panels, and the interior can be paved with anti-slip floor tiles and integrated ceilings.
- Equipment Installation: Pre-install facilities such as toilets, sinks, and septic tanks. Some high-end models are equipped with air conditioners and fresh air systems.
For example, in the customization services provided by Hunan Zhongyi Construction Technology Co., Ltd., the factory strictly processes according to the design drawings to ensure that the precision error of each component is controlled within 2mm.
3. Transportation, Installation, and Acceptance
After prefabrication is completed, the product is transported to the site as a whole or in modules:
- Foundation Treatment: The ground needs to be leveled in advance (with an error of no more than 5cm) to ensure the stability of hoisting or assembly.
- Rapid Assembly: The whole toilet is directly placed by a crane; for modular toilets, wall panels and roofs need to be assembled, and they can be used after connecting water and electricity. The whole process takes about 2-4 hours.
- Acceptance Standards: Check the airtightness of doors and windows, the continuity of electrical circuits, and whether the sewage system is unobstructed to ensure compliance with the Design Standard for Urban Public Toilets (CJJ14-2016).
Tip: Before customization, it is advisable to conduct on-site inspections of supplier cases and confirm their qualifications (e.g., environmental protection certifications and construction qualifications) and after-sales service capabilities to ensure project quality and long-term user experience.