How to Settle Accounts for Container Houses
The settlement for container houses mainly involves three aspects: purchase settlement, freight settlement, and dismantling cost settlement.

Purchase Settlement: When a company purchases container houses, it should record the purchase costs in detail. This includes the price of the container houses themselves, which is the core cost of the purchase; transportation costs, which are the expenses for delivering the container houses from the supplier to the designated location; and installation costs, which cover all the expenditures incurred in installing the container houses in the appropriate positions and making them usable. All costs should be accurately recorded according to the actual amounts incurred. After the purchase is completed, the container houses should be recognized as an asset of the company, with a corresponding asset item added to the balance sheet and filled in with the purchase cost.
Freight Settlement: The calculation methods for container house freight vary depending on the transportation mode, cargo attributes, and the policies of the transportation company.
- Express Freight: The chargeable weight is the greater of the actual weight and the volumetric weight. The formula for calculating volumetric weight is generally length × width × height (in centimeters) ÷ the volumetric weight conversion factor (such as 6000 or 5000). The base freight is set by the express company, including the first-weight charge and the additional-weight charge. Other fees include remote area surcharges and insurance fees.
- Logistics Freight: There are weight-based charges, suitable for heavy and low-value goods; volume-based charges, for goods that are large in volume but light in weight; and combined charges, which take into account both the weight and volume of the goods. Other fees include loading and unloading fees and insurance fees.
- Sea Freight: For liner shipping, the freight includes basic freight (determined by the cargo class and shipping route) and surcharges (such as bunker adjustment factors and port surcharges). For charter shipping, the voyage charter freight is calculated based on the ship's voyage, taking into account factors such as the cargo quantity and voyage distance. In practice, the most reliable method is to directly contact the transportation or logistics company to obtain a detailed freight quotation and calculation method. When signing a transportation contract, it is important to clarify the freight terms, including the freight calculation method, payment time, and payment method.
Dismantling Cost Settlement: The dismantling costs for container houses are usually determined based on industry practices, market conditions, and the complexity of the actual dismantling work. The main calculation methods include charging by dismantling items, charging by house area, and charging by working hours. The key factors affecting dismantling costs include the house structure and materials, the dismantling method and difficulty, garbage disposal costs, market conditions, and labor costs. Before dismantling a container house, it is advisable to consult a professional dismantling company or relevant institution to obtain an accurate quotation and professional advice, clarify the dismantling scope and requirements, sign a contract, and keep evidence.




