How to Prefabricate Concrete Houses
The construction of prefabricated concrete houses mainly consists of four steps: component manufacturing, foundation treatment, component transportation and installation, and subsequent processes.

Component Manufacturing: The main body of the house is prefabricated by pouring concrete components in a factory. Workers first assemble metal steel plates into molds required for pouring prefabricated concrete components using bolt connectors. After spraying a mold release agent on the mold surface, they cross-place steel bars in the mold and bind them into a mesh framework with steel wire to enhance the tensile strength of the components. Connectors are placed symmetrically inside the steel bar mesh as connection points for cranes. Then, concrete is filled into the mold, and a vibrator is used during pouring to remove air bubbles. After the concrete is poured and the surface is smoothed, a plastic greenhouse is used to cover it, and a heating device is installed to promote the cement hydration reaction and ensure component strength.
Foundation Treatment: Similar to general house construction, a foundation must be laid before building a prefabricated concrete house. One approach is to dig a large pit about 1 meter deep at the site of the house foundation. After laying a moisture-proof PE film at the bottom of the pit, waste concrete materials from construction and demolition activities are poured into the pit as a base. After this layer of waste concrete, which is more than 10 cm thick, has completely solidified, guide steel plates for positioning prefabricated concrete piles are installed, and large prefabricated concrete base plates rest on the guide steel plates. Another approach, such as that used in rural areas of South Korea, involves first leveling the foundation and pouring a cushion layer. After excavating about 60 centimeters, a white plastic sheet is laid, and a concrete pump truck is used to pour the foundation without using steel bars in the foundation. The white plastic sheet is laid in advance to prevent moisture loss from the concrete, promote the hydration reaction, and enhance strength and durability. After the concrete solidifies, anchor plates are installed, holes are drilled using a drill, and expansion screws are used for fixation. The anchor plates fix the foundation piles to the cushion layer. After that, prefabricated foundation piles weighing about 5 tons are installed, and beams are installed like building blocks. After horizontal measurement and adjustment, they are fixed with nuts. Foam sealant is used to fill the gaps between the beams and foundation piles, and the nut fixation points are sealed with cement.
Component Transportation and Installation: The prefabricated concrete components manufactured in the factory are transported to the construction site for house construction. Cranes and other transportation and construction machinery are used to assemble and install the components. For example, beams are quickly connected using mortise-and-tenon joints, stairs are hoisted like building blocks, floor slabs are laid, and finally, grout is poured into the gaps between all components.
Subsequent Processes: After installation is complete, subsequent processes such as decoration are required.