Moving the toilet in an old bathroom can be achieved through methods such as using a toilet offset connector, drilling through to the floor below to connect pipes, or raising the floor level. Details are as follows:

1. Using a toilet offset connector
This method is suitable for small-scale, short-distance relocation, typically moving distances of 10 - 30 centimeters, with a maximum of no more than 40 centimeters. Its core advantages lie in minimal modification, low cost, and relatively simple construction. The specific operation involves using flat elbows and round pipes, which are glued together in the middle and equipped with sealing gaskets to ensure the tightness of the connections and prevent water leakage. However, it should be noted that a toilet offset connector may affect the flushing effect and increase the risk of blockage. Therefore, a slope of 1% - 3% must be reserved during construction to use gravity to assist with drainage and reduce the probability of blockage. This method is suitable for scenarios with low space modification requirements and limited budgets.
2. Drilling through to the floor below to connect pipes
If a larger-distance relocation of the toilet is required, consider drilling from the original position through to the ceiling of the floor below and laying new drainage pipes in the space below. This method requires full consultation with the occupants of the floor below to obtain construction permission. However, there are significant difficulties in actual operation: in new developments, occupants may not be familiar with each other, resulting in high consultation costs; in old buildings, it may not be possible to drill holes due to the limitations of the floor structure. In addition, construction requires damaging the ceiling of the floor below, which may lead to neighborhood disputes. Therefore, this method is only recommended in special circumstances.
3. Raising the floor level
By constructing a ground base of a certain height, the entire toilet is raised to create space for the re-layout of the drainage pipes. The specific height needs to be determined according to the relocation requirements, usually requiring a raise of more than 180 millimeters (the standard value is inferred from incomplete reference information). This method can completely solve the problem of drainage slope but will significantly increase the floor height of the bathroom, which may affect the overall aesthetics and comfort of use. During construction, it is necessary to ensure that the base structure is stable and that waterproofing is properly done to avoid the risk of leakage due to the raised floor.
Selection advice: First, judge based on the relocation distance: choose the toilet offset connector method for distances of 10 - 40 centimeters; choose the drilling method when a larger distance is required and the occupants of the floor below agree; choose the floor-raising method when the floor height allows and stability is pursued. Regardless of the method used, a flushing test must be carried out after construction to ensure smooth drainage, and the condition of the pipes should be regularly checked to prevent potential problems during long-term use.