How to Customize Prefabricated Houses
The customization process for prefabricated houses mainly consists of four core stages: customized production, full-truck transportation, overseas shipping, and on-site assembly. Details are as follows:

1. Customized Production, Modular Packaging
The customization of prefabricated houses centers around customer needs. First, the house type (e.g., single-story/double-story, number of rooms), style (modern/rustic/industrial), and function (residential/office/commercial use) must be specified. Factories then carry out modular production based on design drawings, dividing the house into independent modules such as walls, floors, and roofs. Each module is uniformly coded and inspected by category. During production, emphasis is placed on enhancing protective performance: waterproofing involves using polymer waterproof membranes or coatings to cover module seams; corrosion resistance is achieved by galvanizing or spraying anti-corrosion paint on steel modules; seismic design improves earthquake resistance by adding structural supports or using shock-absorbing materials. All module dimensions must strictly conform to international standard shipping containers (e.g., 20-foot or 40-foot containers) to avoid wasted transportation space.
2. Full-Truck Transportation, Direct to Port
Finished modules are transferred to domestic ports via specialized flatbed trucks, ensuring modules are securely fixed to prevent damage from bumps. Since module dimensions perfectly match containers, "zero-waste" loading is achieved, significantly reducing unit volume transportation costs. For example, a 40-foot container can hold approximately 30 square meters of house modules, with transportation efficiency far exceeding traditional bulk material shipping.
3. Overseas Shipping, Global Distribution
Packaged modules are shipped to target markets via ocean freighters, with logistics timelines varying by region: Southeast Asia takes about 7 days, the Middle East about 20-25 days, and Europe/North America about 30-35 days. Throughout transportation, IoT technology enables traceable management, allowing customers to monitor module location, temperature, humidity, and other environmental data in real time to ensure cargo safety.
4. On-Site Assembly, Rapid Completion
Upon arrival at overseas ports, modules are transported directly to construction sites for assembly. The assembly process eliminates traditional wet operations like bricklaying and plastering, as well as on-site piping installation. Instead, cranes lift modules into position, where they are connected via standardized interfaces (e.g., bolt fastening, snap-fit connections) to complete structural assembly, followed by water and electricity system connections. For a 100-square-meter residence, 4-6 workers can complete full assembly in 3-5 days, with efficiency 5-8 times higher than traditional construction methods. After assembly, airtightness, watertightness, and structural stability tests are conducted to ensure compliance with local building codes.