Back to blog
Article

How to Calculate the Output Value of Prefabricated Houses

Admin September 18, 2026

The calculation of the output value of prefabricated houses needs to be determined based on specific situations and industry characteristics. Common methods include the total output value of the construction industry, completion output value, progress method, and output value calculation in special situations. Details are as follows:

1. Calculation of the total output value of the construction industry If prefabricated houses fall within the scope of construction projects, their output value is usually calculated by multiplying the actual completed work volume by the budgeted unit price, and then combining it with construction management fees, independent fees, profits, and taxes for comprehensive calculation. For example, the output value of the installation project of prefabricated houses can be calculated based on the actual completed amount of equipment installation, combined with the budgeted unit price and labor cost adjustments (including indirect cost rates, planned profit rates, and tax rates). This method is applicable to output value statistics during the construction phase. It is necessary to ensure that the work volume data is complete to avoid duplication or omission.

2. Calculation of completion output value For completed prefabricated house projects, the output value is usually determined based on the budgeted cost, that is, the value of the final result expressed in monetary terms. For example, if a prefabricated residential building is completed and passes the acceptance inspection, and its total budgeted cost is 50 million yuan, then the completion output value of this project is 50 million yuan. This method is applicable to output value accounting after project completion. It is necessary to ensure that the budgeted cost is consistent with the actual cost on the premise of passing the acceptance inspection.

3. Calculation by the progress method (for uncompleted projects) If the prefabricated house project has not been completed, the output value can be calculated by multiplying the proportion of the actual completed progress to the total progress by the total contract cost. For example, if the total contract cost of a project is 100 million yuan and the current completed progress is 30%, then the output value for the current period is 30 million yuan. This method is applicable to projects with a long construction period. It is necessary to regularly evaluate the progress proportion and ensure the accuracy of the total contract cost. If there are fluctuations in material or labor prices and the contract has adjustment clauses, the output value should be adjusted as agreed.

4. Calculation of output value in special situations

  • Rental income: If prefabricated houses are used for renting, their output value can be calculated through rental income, that is, the total rent obtained from renting out the houses. This method is applicable to prefabricated houses for business purposes. It is necessary to count the actual income based on the lease contract.
  • Appraised value: In house appraisal or transactions, the output value may be determined through the appraised value, taking into account factors such as the location, area, structure, decoration, and market conditions of the house. This method is applicable to asset valuation scenarios and requires an appraisal report issued by a professional institution.

Precautions:

  • Ensure that the data is complete and accurate during calculation to avoid omission or duplicate statistics.
  • There may be differences in pricing standards in different regions, and local regulations should be followed.
  • If there are price fluctuations or contract adjustments, handle them according to the agreed terms to ensure the compliance of output value calculation.