House Prefabricated Construction Process Video
Currently, there is no direct video link available for the prefabricated construction process of houses, but the prefabricated construction processes for different types of houses can be outlined based on descriptions from relevant videos:

Construction Process of Prefabricated Houses in Rural South Korea: First, the foundation is treated by leveling the site and pouring a cushion layer to provide a stable base for subsequent installations. Next, foundation piles weighing about 5 tons each are installed and fixed to the ground with base plates to ensure the stability of the house. After that, beams are spliced together using mortise-and-tenon joints, which allow for quick alignment and improve construction efficiency. Once the beam splicing is complete, soil is backfilled and the foundation is poured to further enhance its load-bearing capacity. During the main structure construction phase, stairs are hoisted like building blocks, 5-centimeter-thick floor slabs are laid, and finally, the gaps between components are grouted to ensure the overall integrity and tightness of the house structure. The entire main structure construction process takes only 14 days.
Construction Process of Prefabricated Wooden Houses: First, the house chassis frame is built on a pre-poured concrete foundation, floor joists are laid, and metal connectors are used to lock the joints, ensuring the stability of the frame. Subsequently, the prefabricated wall modules are moved onto the platform, erected, and fixed to form the basic outline of the house. After the exterior wall frame is enclosed, internal fine division is carried out, and partition wall frames are built to prepare for the division of the interior space of the house. Then, the second-floor floor beams are laid to provide support for the upper space. Finally, the house is capped by transporting the huge triangular trusses into place and placing them on the top beams of the walls to complete the overall construction of the wooden house, which takes only a few days from an empty lot to a perfect wooden house.
Full Process of Prefabricated Building Construction: The animated analysis shows the steps of prefabricated foundation excavation and fixation, base beam embedding, basic structure fixation, and auxiliary bolt fixation. These steps are the fundamental procedures in the construction of prefabricated buildings, with each step closely linked from foundation excavation to structural fixation, ensuring the stable and safe construction of prefabricated buildings.