How to Cap a Hoisted Prefabricated House
The methods for capping a hoisted prefabricated house mainly include slate-and-yellow-mud capping, prefabricated concrete capping, the capping process for prefabricated panel houses from the 1980s, and the construction of prefabricated panel capping tiles, among others.

Slate-and-yellow-mud capping method: First, arrange a row of I-beams on the roof as the load-bearing structure. Use a unique transportation method to transport the slates to the roof and place them one by one, ensuring that the width of the slates matches the reserved distance of the I-beams. After laying, fill with cement mortar for waterproof sealing. Once the cement has dried, wet it with water. Then, fill yellow mud on the surface of the slates and compact it evenly. The roof edges are constructed with sticky yellow mud and red bricks. Finally, enhance the roof's sturdiness and waterproof sealing effect by creating a multi-layered structure on the surface of the red bricks.
Prefabricated concrete capping construction method: Workers prepare the concrete panels on the ground in advance. Due to their heavy weight, a crane is required to lift them to the rooftop. Then, use tools to piece the concrete panels together one by one, similar to building with blocks. During the assembly process, each panel must be carefully aligned to ensure no misalignment. Once all panels are secured, the rooftop is basically complete. Workers then need to conduct a thorough inspection to ensure the safety and reliability of the concrete capping.
Capping process for prefabricated panel houses from the 1980s: The first step is foundation construction to ensure the building structure is sturdy and reliable. After completing ground laying and compaction, proceed with foundation pouring. Next, install the columns by positioning the foundation columns, adding polypropylene film for waterproofing between the prefabricated columns and the foundation, and then installing and securing the prefabricated columns with screws. Then, install the purlins by fixing wooden joists onto the prefabricated panels and then installing the purlins, ensuring uniform spacing and good connectivity. After that, proceed with insulation layer construction by selecting appropriate insulation materials and paying attention to their fit with the purlins and supports. For roof laying, choose roofing materials based on actual needs, conduct waterproofing treatment before laying, and pay attention to the position of panel seams and slope. Finally, carry out finishing work by cleaning the site, disposing of construction waste, and conducting acceptance according to relevant standards.
Construction plan for prefabricated panel capping tiles: The project includes processes such as prefabricated panel installation, roof waterproofing, insulation layer laying, hanging strip installation, and tile laying. Construction preparation includes technical preparation, material preparation, and equipment preparation. During actual construction, first install the prefabricated panels, and then proceed with roof waterproofing, insulation layer laying, hanging strip installation, and tile laying operations.
You may also like

Portable Toilet Independent: What to Know Before You Buy
Read More
Portable Toilet Waterproof Explained: How to Choose the Right One
Read More
Portable Toilet Insulation: Top Options & Considerations
Read More