Hedong Container House Installation
The installation of container houses in Hedong requires selecting the appropriate process based on the specific type. Common installation methods include the installation of packing-box units, foldable container houses, and modular container houses, with core steps covering foundation preparation, structural assembly, component fixation, and acceptance testing and commissioning.

Packing-Box Unit Installation Process
For packing-box unit installation, first fix the corner aluminum. Use blind rivets to fix one side of the corner aluminum to the installation position. Install the full-length wall panels first, followed by the small side panels near the door, the door head panels, and the channel aluminum at the door frame. For the wall and roof, firmly fix the other side of the corner aluminum to ensure structural stability. For inside corner installation, cut the corner aluminum according to the internal dimensions and install it in a counterclockwise direction. Install the top corner molding first, and ensure that the corner aluminum at the corners does not overlap. For window installation, first fix the window frame aluminum. Use 45-degree blind rivets to fix it to the composite panel. After completing the window frame, install the window and adjust its position. Finally, secure it to the window frame aluminum with self-drilling screws.
Foldable Container House Installation Process
For foldable container house installation, first check the stability of the steel wire ropes. Lift the main frame and unfold it smoothly. Place support rods in the middle of the container to maintain stability. Push open one wall panel and secure it with tightening screws, then push open the other wall panel with doors and windows and tighten the screws. Lift the folded container house to the predetermined position and lower it after confirming that there is no one around. The entire process must be carried out by professionals, and non-staff members should stay away from the installation area to avoid danger.
Modular Container House Installation Process
Modular container houses adopt a 'factory prefabrication + on-site installation' model. Unit modules are manufactured in the factory and then transported to the site for assembly. During installation, ensure that the steel structure uses galvanizing technology. It consists of a structural system, a ground system, a floor system, a wall system, and a roof system, which are connected by bolts to form an integral whole. The installation process does not generate construction waste, and no waste will be left after the project is demolished, meeting green and environmentally friendly requirements.




